Ref no. |
Organisation |
Project |
Project cost |
Amount requested |
% of cost requested |
Suggested score |
Amended score |
SCAP23-24\37
|
Henley on Thames Town Council (Page 18) |
Mill Meadows Adventure Playground |
£130,137 |
£65,068 |
50.00% |
26 |
No change |
SCAP23-24\33
|
Aston Rowant Parish Council (Page 24) |
Play area upgrade and new equipment |
£43,626 |
£20,315 |
46.57% |
24 |
No change |
SCAP23-24\55
|
River & Rowing Museum Foundation (Page 30) |
Ratty's Refuge Reimagined |
£19,090 |
£9,545 |
50.00% |
22 |
26 |
SCAP23-24\59
|
South Moreton Parish Council (Page 37) |
South Moreton Playground Enhancement |
£7,903 |
£3,951 |
49.99% |
20 |
21 |
SCAP23-24\29
|
Kidmore End and Sonning Common Parochial Church Council (Page 41) |
Roof replacement and energy efficiency measures. |
£211,000 |
£24,000 |
11.37% |
19 |
No change |
SCAP23-24\35
|
Chinnor Village Centre (Page 47) |
Keeping the Lights On-Upgrade to LED Lights |
£4,079 |
£2,039 |
49.99% |
18 |
No change |
SCAP23-24\42
|
Parochial Church Council North Moreton (Page 52) |
Safe and More Efficient Use of Village Hall |
£57,295 |
£21,485 |
37.50% |
18 |
19 |
SCAP23-24\54
|
Berinsfield Parish council (Page 56) |
New high pedestal slide |
£11,481 |
£5,740 |
50.00% |
17 |
No change |
SCAP23-24\67
|
Thame Town Cricket Club Limited (Page 60) |
Solar Panels controls housing |
£2,400 |
£1,200 |
50.00% |
16 |
No change |
SCAP23-24\46
|
South Stoke Community Shop (Page 64) |
Community Shop Rebuild Project |
£392,793 |
£75,000 |
19.09% |
16 |
19 |
SCAP23-24\43
|
Tetsworth Parish Council (Page 69) |
Play area surface replacement |
£51,391 |
£24,999 |
48.64% |
15 |
18 |
SCAP23-24\48
|
1st Goring Heath Scout Group (Page 73) |
Scout Hut Window Replacement and Access Ramp Project |
£16,182 |
£8,091 |
50.00% |
13 |
18 |
SCAP23-24\68
|
Didcot District Guide Association (Page 78) |
Refurbishment of our hall |
£56,947 |
£24,999 |
43.90% |
13 |
14 |
SCAP23-24\44
|
St Leonard's Parochial Church Council (Page 82) |
St Leonard's church bells restoration |
£82,556 |
£9,999 |
12.11% |
9 |
No change |
SCAP23-24\41
|
SHEDQUARTERS (Page 86) |
SHEDquarters workshop |
£9,374 |
£4,374 |
46.66% |
9 |
16 |
SCAP23-24\58
|
Henley Town Football Club (Page 91) |
Facility for improvements, upgrade and maintenance. Mower and machinary and equipment storage |
£10,000 |
£5,000 |
50.00% |
7 |
No change |
|
|
|
|
Total Requested
£305,805 |
|
Budget
£320,000
|
|
|
|
|
|
|
|
Scoring and award matrix for Capital Grant applications
Suggested Scores |
Priority Level |
Awards: (all awards are subject to sufficient budget. Medium priorities will only receive funding if there is budget left after all the high priority projects are awarded).
Scores: The scoring thresholds which identify what priority level the project falls into can be amended, depending on the number of applications received and potential allocation of funds to ensure maximum community benefit. As agreed by the Cabinet Member. |
21-30 points |
High priority |
We will award full amount requested - budget permitting - Capped at 50 per cent of the cost unless we allow a request for more and they meet the criteria for an exception. |
15-20 points |
Medium priority |
Award between 50 and 75 per cent of the amount requested, depending on the score - budget permitting |
0-14 points |
Low priority |
No funding awarded
|
Cross-Cutting Criteria – all projects to be scored against these
Community need, inclusion and consultation
Scoring guidance – the council wishes to support projects aimed at improving community well-being and resilience to recover from the pandemic as well as providing new activities or facilities. We also wish to prioritise those projects which encourage access for all and help meet the council’s equality objectives. To achieve the highest point within each section, we would like to see evidence that stakeholder consultation and/or an accessibility audit has been carried out to establish the level of need for the project.
Should there be other similar facilities available in the local area, emphasis should be placed on providing evidence that there is sufficient demand within the community to support this work. We expect that all applications comply with the Equality Act 2010 and can offer support to help ensure your project is accessible for all. For projects that aim to improve parks, play equipment and public spaces (such as Multi Use Games Areas (MUGAs) and outdoor sports facilities), please consider how to encourage usage from more girls and young women in your designs https://makespaceforgirls.co.uk/.
Points |
Criteria to score |
Project examples |
0 |
The project did not involve consultation with stakeholders, and no evidence of need, new activities or improvement to existing activities has been provided |
A decorative village sign that will be mainly used for people outside of the community or doesn’t allow any community activities to take place nor give the community a facility to use. |
1-2 |
(1 point) Little additional use/improvement will be gained as a result of the project e.g. the project replaces existing facilities or allows existing activities to continue. Or The project moderately improves a minor community facility or activity.
(2 points) as above and Some consultation has taken place.
|
It replaces furniture in the village hall with like-for-like replacements. No consideration has been given to providing more accessible furniture (higher chairs with backs and arm rests)
Replacing like-for-like playground equipment without consultation for how the space could be improved to enable more users or provide more inclusive play equipment.
A decision to undertake the project has been taken at committee level with little detail of how existing users or wider community have been consulted. |
3-4 |
(3 points) the project moderately improves or extends a substantial community facility or activity. or the project significantly improves or extends a minor community facility or activity. or the project provides a new minor facility or activity for the community.
(4 points) as above and consultation has been carried out with existing users but no evidence to suggest this has been done with the wider community.
|
Replacing existing park benches with longer-lasting accessible ones, replacing the chairs in the village hall with more comfortable accessible ones or improve a play area to cater for more ages.
Refurbishment of changing rooms to increase capacity and accessibility for disabled and mobility impaired people (e.g. disabled toilets, handrails, accessible changing rooms)
Increase club participation by purchasing boats for a small canoeing club or increasing the size of a playing area providing some new equipment.
Feedback has been formally invited from members via a survey or AGM. Some evidence of informal feedback from users of the facility would score less points.
|
5-6 |
(5 points) the project will provide substantial new facilities or activities to the community. or the project significantly improves the capacity of a significant community facility.
(6 points) as above and substantial consultation has been carried out with the community/other stakeholders, including minority groups if project impacts on them.
|
Creating a brand-new play area where there wasn’t one already which takes into consideration all users and provides inclusive equipment. (e.g. equipment for disabled children, sensory equipment, wheelchair accessible paths, accessible seating and picnic benches)
Adding a large extension to a village hall that is accessible to all. If not already part of the building also considers disabled and mobility impaired users, people of small stature (e.g. disabled parking, accessible kitchen space, disabled toilet, wheelchair accessible doorways/ramps/entrance and egress)
The significant reorganisation of a facility to increase capacity where full consideration has been given to all users including those that are disabled or mobility impaired.
Creation of a new sporting facility such as Multi Use Games Area (MUGA), pavilion or playing pitch that meets the needs of all members of the community including disabled and mobility impaired people.
An accessibly audit has been completed and changes to the project have been adopted to improve access to all.
Every effort has been made to invite all members of the community and stakeholders to provide feedback through a formal survey, AGM or open days. The organisation has identified minority groups in the community and delivered targeted communication to encourage participation. Improvement of facility is included in the local plan or leisure facility strategy (or similar).
|
Deductions |
- Deduct one point if the project reduces the activities/facilities on offer - Deduct two points if the project removes a community facility or stops existing activities taking place. In addition, the panel can recommend not funding a project if they have serious concerns around the management of the project now or in the future, or serious concerns about the appropriateness of the project e.g. should it become apparent that the community don’t support the project or would prefer a different solution
|
A project to overhaul and landscape a car park that reduces the number of parking spaces or disabled parking spaces.
Demolishing an old skatepark without replacing it with anything. |
Community benefit
Scoring guidance – This scoring criteria focusses on the groups or communities who will directly use the facility/take part in the project. To achieve the highest point in each section, projects should demonstrate that they are either benefiting a greater number of residents when compared to other projects in the same category, or specifically improving access for vulnerable people and priority groups, which may include – note this is not an exhaustive or a definitive list- the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments.
Points |
Criteria to score |
Project examples |
0 |
The project offers little or no direct benefit to the community. |
A decorative sign or boundary wall with no other purpose |
1-2 |
(1 point) A single sport or special interest group, like an art group, will benefit.
Please note, if a sport club wanted to upgrade their pavilion and other groups frequently use it as well, it can score more.
(2 points) as above and
|
A project to buy cricket pitch covers, IT equipment for a photography club or landscaping a nursery’s garden is only benefiting their members/users. |
3-4 |
(3 points)
(4 points) as above and
|
A football club is upgrading its changing room, which a hockey club also use
Specialist equipment for a centre working with severely disabled people.
A property/building that promotes social cohesion to help reduce social and rural isolation. |
5-6 |
(5 points)
(6 points) as above and
|
Play areas, community building or recreation ground that are accessible to all.
The project improves accessibility of a community facility for vulnerable people or priority groups, which can include – note this is not an exhaustive or a definitive list - the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments
|
Deductions |
- Deduct at least one point if the project will reduce - Deduct two points if it totally removes an existing benefit to the community without replacing it.
|
Replacing a recreation ground with tennis courts for a members’ club (open community benefit is reduced as only tennis members will benefit going forward).
|
Action on Climate Emergency
Scoring guidance – these criteria is not intended to be used to score against the climate actions taken within the project itself, but to recognise the applicant’s commitment to climate action in general, and how they may make positive contributions to the climate emergency in other areas of their work/organisation.
Points |
Climate Action overview |
Example |
0 |
The organisation has given limited consideration to the climate emergency.
|
|
1-2 |
(1 point) The organisation has given some consideration into possible actions that address the Climate Emergency, with limited evidence of any actions undertaken.
(2 points) The organisation has delivered one-off or minor events or activities that contribute to the Climate Emergency
|
Such as research into improving the energy efficiency of building/organisation operations, or research into promotion of waste minimisation
Such as replacing some lightbulbs with energy efficient ones, installing bike racks, implementing an energy smart meter, hosting a climate themed coffee morning. |
3-4 |
(3 points) The organisation has implemented multiple or regular minor events, activities or services that contribute to the Climate Emergency
(4 points) as above and Adoption of a simple sustainability/ climate action policy/statement for the organisation
|
Such as replacing all lightbulbs with energy efficient ones, use of local suppliers/plant-based foods for events and activities, providing a cycle to work scheme, regularly hosting climate themed coffee mornings or talks, moving regular supporter communications online instead of print, planting and/or management of a public space to improve its biodiversity. |
5-6 |
(5 points) The organisation has implemented multiple Climate Emergency related events, activities or services as routine part of the organisation’s workplan, and have a sustainability/ climate policy showing a high-level commitment by the organisation to addressing the climate emergency
(6 points) as above and have a sustainability / climate action forward plan or strategy for the organisation |
Such as energy audit of premise(s) commissioned and investment in recommendations, staff/volunteer training on climate literacy, engagement with partners on sustainability programmes in the community |
Finance Sustainability
Scoring guidance – Officers will be looking for a sound fundraising plan with contingencies should any of their grant applications (to the council and others) be unsuccessful or receive less than requested.
Competition for funds mean that organisations which still have a large fundraising liability and will have to provide substantial evidence to give confidence that the project will be seen through to completion within the accepted project timeframe. Therefore, organisations are strongly encouraged to seek additional funding from elsewhere before applying to the council. To achieve the highest point in each section, we would expect to see evidence that the applicant has included ongoing maintenance costs and eventual replacement.
Points |
Financial overview |
0 |
They don’t have a plan of how they’ll fund the rest of the project and haven’t secured any other funding yet.
They haven’t given details of how they’ll fund the ongoing maintenance and eventual replacements. |
1-2 |
(1 point) They’ve got a funding plan but haven’t applied for all of it yet. or They’ve applied for all the other funding needed but have secured less than 50 per cent so far.
(2 points) as above and They’ve also budgeted for the ongoing maintenance but don’t say how they’ll fund eventual replacements in the future (if applicable). |
3-4 |
(3 points) They’ve applied for all the funding needed and have already secured 50 per cent or more of the balance, including contingency funding should some of their applications be unsuccessful or partially successful.
(4 points) as above and They’ve also budgeted for the ongoing costs and have a general idea how they’ll fund replacements eventually (if applicable) |
5-6 |
(5 points) They've secured all the other funding needed for the project already (including if they’re funding the rest themselves) and have a contingency plan should they only receive a partial grant from the council. or The organisation has requested 100 per cent of the cost and have provided evidence that they’ve lost a funder, can’t raise money themselves (e.g via precept) and can’t apply for other grants/funding.
(6 points) as above and They’ve also budgeted for the ongoing costs and have a fund/account/pot saving for the replacements in due course. |
Deductions |
- Deduct one point if the organisation’s finances suggest they could contribute towards the cost - Deduct two points if they can afford the whole project without any funding. Even if an application scores enough points, the panel can recommend not funding the project if has serious concerns about its financial viability, such as if the organisation has not demonstrated having a sound fundraising plan with contingencies should any of their grant applications (to the council and others) be unsuccessful or award less than requested.
|
Themed criteria – projects scored against one of the following
Scoring guidelines – The application will be marked against ONE of the following sections, depending on which of the four-outward facing corporate plan priorities the applicant categorises the project under:
This section scores each project against the same set of criteria, which recognises improved outcomes for the community through specific, measurable targets. We are also looking for evidence of relevant partnership working and collaboration in project delivery.
Points |
Criteria to score |
0 |
Response is not relevant to the priority theme and/or is not a key outcome of the presented project. The information given does not provide the officer with confidence that the project will result in better outcomes for the community. No information regarding partnership working or community engagement has been offered. |
1-2 |
(1 point) Relevant response that addresses how a capital grant will provide better outcomes to the community at an acceptable standard. The theme has been considered in a minor way, but the information provided lacks some detail. Outputs have been identified, rather than outcomes considered, with more detail needed for how this will be measured. (2 points) as above and Some information regarding minor partnership working or community engagement has been provided. |
3-4 |
(3 points) Clear and relevant response that addresses how a capital grant will provide better outcomes to the community at a good standard under the specific theme. The theme has been considered in a major way with some key measurable outcomes identified. (4 points) as above and Good examples of partnership working regarding project delivery, including examples of collaborations with other organisations and/or the community. |
5-6 |
(5 points) Clear, relevant, and well detailed responses that addresses how a capital grant will provide better, measurable outcomes to the community at an excellent standard under the specific theme. Goes above expectations and fully integrates the project theme into the project plan and outcomes. (6 points) as above and Clearly sets out how they will work in partnership at all levels of project delivery to meet the corporate plan priority and how partner organisations and/or the community have been involved in project planning and implementation. |
Project examples under each theme
Points |
Protect and restore our natural world |
Improved economic and community wellbeing |
Homes and infrastructure that meet local need |
Action on the Climate Emergency |
0 |
Tree planting projects without evidence of landowner permission or commitment to long-term maintenance of the planting. Tree planting or habitat creation projects on unsuitable sites – all projects should involve some form of initial ecological survey to ensure the right trees (or other habitats) are being planted in the right place (i.e. not planting trees on existing wildflower meadows) Projects which have involved no consultation and have not obtained baseline information from the Thames Valley Environmental Records Centre. |
Projects that fall under another thematic area and/or meet the unsatisfactory criteria. |
Projects that fall under another thematic area and/or meet the unsatisfactory criteria. |
A project to upgrade toilet facilities does not include energy saving features such as light sensors A boiler is replaced with a more efficient one but only meeting building regulations |
1-2 |
Projects involving only small areas with only minimal biodiversity and community benefit. No community or volunteer involvement.
Small scale tree or hedgerow planting with little wider benefit and not following relevant local or national priorities. |
New office equipment related to community transport schemes that reduces rural isolation. New furniture for advice services that help to improve mental health.
The installation of a Defibrillator to improve a community’s physical wellbeing.
Improvements to an existing social enterprise which promotes economic recovery such as community shop or community pub, but the project does not result in any new activities taking place (e.g. replacement of windows from single to double glazing) |
Projects to encourage sustainable transport and reduce car dependency in a new housing development but are replacing an existing facility with a like-for-like design (e.g. replacing cycle storage, no additional capacity) |
Minor investment in energy efficiency leading to reduced energy bills. Lighting or insulation in one area e.g kitchen. Draught proofing installed in a building. A timer or smart metre is added to heating controls
Minor projects to help adapt to climate change e.g. water saving taps and urinals measured by reduced water consumption Minor sustainable transport projects e.g. cycle racks resulting in some evidence of behaviour change
Equipment for projects that promote the circular economy (reuse and repair of goods and materials) e.g. IT equipment, storage, kitchen fixtures and fittings. |
3-4 |
Medium scale projects evidencing good community involvement and a commitment to partnership working. Projects or proposals fitting in with relevant local and national priorities. This might for example include planting a small woodland or creating wetlands in an appropriate location working with local volunteers and not-for-profit organisations. Projects well designed with evidence of consultation with relevant bodies. |
Facilities that encourage culture, leisure and art to promote social wellbeing (e.g. expansion of sports facilities, creation of public arts, purchasing of village hall staging, theatre refurbishment) Building refurbishment costs for organisations that support vulnerable people (e.g. those with disabilities or to improve mental health) Refurbishment of a facility that improves social isolation and deprivation (e.g. Buildings that hold advice and debt services. befriending services, good neighbour schemes, volunteer driver schemes, food banks). Improvements to an existing social enterprise that will allow for the expansion of services or for new services to take place. (e.g. a community shop expanding to carry more stock which meets local demand or a community pub adding café facilities to enable longer opening hours for the community to meet and reduce social isolation) |
Refurbishing empty community properties for the benefit of the community/not residential (e.g. refurbishing a community hub for young families, refurbishing a building that houses charitable organisations supporting vulnerable people) Improving green space facilities that are accessible for all in a new housing development. (e.g. signage, creating private footpaths, fencing, planting, benches accessible for mobility impaired people) Projects to encourage sustainable transport and reduce car dependency by working with the community to upgrade already existing cycle storage in a new housing development to allow more bikes and better protection. |
Investment in building energy efficiency using more than one technology eg LED lighting with lighting controls, insulation, a building management system measured by a good reduction in energy bills Projects to help adapt to climate change eg solar shading and water saving measures
|
5-6 |
Large scale habitat creation/restoration projects or tree planting projects forming a key part of meeting relevant local and national priorities. Projects that evidence widespread consultation/partnership working and careful planning to ensure the project is creating the right habitats in the right place. Projects that have thoroughly considered the long-term sustainability of the proposals and evidence how ongoing management and maintenance will be provided for.
High quality proposals which are fully costed demonstrating value for money alongside an appropriate specification. |
Projects that promote economic recovery and quality employment through the creation of a new social enterprise such as a community shop or pub that will result in new job creation and/or create volunteer training opportunities that could provide future employment opportunities for local residents
Projects that help create new long term, sustainable funding opportunities for the organisation (e.g. refurbishment of a community centre that includes a volunteer run café) Creation of a new facility that improves social isolation and deprivation (e.g. A new building that will house advice and debt services, food banks, befriending services.) |
Projects that create new and improved infrastructure for communities in a new development to promote cohesion and that are accessible to all (e.g. village halls, playgrounds, outdoor gyms, sports facilities) Creating new accessible green spaces in partnership with local organisations to ensure that all members of the community can access the space to improve physical and mental wellbeing (e.g. purchase of land with accessible pathways, extensive planting and facilities such as benches) Projects that actively promote sustainable transport and reduce car dependency by creating a new substantial cycle storage facility that meets the needs of the community and promotes sustainable methods of transport to the wider community. |
Projects to help achieve significant carbon emission savings for organisations/facilities e.g. investment in renewable technologies such as solar energy and heat pumps Substantial investment in building energy efficiency such as full lighting retrofit, upgraded loft and wall insulation measured by a significant reduction in energy bills A project ensures energy saving measures are a high-profile feature of the facility, with energy monitors in public areas and information about the savings clearly visible and attractive manner to users
Substantial project for a community facility to help adapt to climate change e.g. rainwater harvesting system or substantial sustainable transport projects e.g. electric car charging points Creation of a permanent community run facility that promotes the circular economy (reuse and repair of goods and materials) e.g. Repair Cafe, refill centre |
Henley on Thames Town Council |
Ref |
SCAP23-24\37 |
Project Name: Mill Meadows Adventure Playground |
||
Project
Description: A project to
replace and expand the existing adventure playground at Mill
Meadows. The existing adventure playground was installed in 2009 and is towards the end of its life. The playground is extremely popular with both local residents and visitors to Henley, and the project will ensure that the new playground improves the range of play equipment; makes the playground as inclusive and accessible as possible; and ensures there is a biodiversity net gain. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Henley On Thames |
||
Potential number of beneficiaries: 10,000 |
Project Finances
*Organisation has advised they have all the funding needed for the project using their reserves.
Organisations latest bank balance: £516,875
Previous community grants:
· CU25k£\243 Floodlights for Astro pitch at Tesco sportsground £6,218 – grant complete. · CCGO/14 Henley Skatepark £100,000 – grant complete. · SCap18-19\33 Town Hall audio system £15,491 – grant complete. · SCap18-19\36 Outdoor Gym Equipment £7,499 – grant complete. · SActive22\14 Makins Basketball Court £1,000 – grant complete. · CGS22\100023 Makins Basketball Court £2,000 – grant complete (funded separate elements of the project).
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project significantly improves an important community facility by refurbishing the playground and installing new equipment to cater for different age ranges and abilities. Consideration has been given to all users including those that are disabled; an access audit has been carried out and associated actions are being taken. Initial public consultation has taken place with a plan to carry out further consultation on the final design, which will include engagement with stakeholders of minority groups and vulnerable users. |
Score |
5/6 |
|||||||||||||||||
Community benefit The project will improve and provide a facility that is open to anyone to access and demonstrated how the facility will be inclusive and accessible to users. The town council estimates it will benefit 10,000 residents, so this project benefits a greater number of residents when compared to other projects in the same category.
|
Score |
6/6 |
|||||||||||||||||
Action on Climate Emergency The organisation has implemented multiple climate related activities or services as a routine part of the organisation’s workplan, including undertaking energy audits of all the town council's buildings and carrying out subsequent recommendations and works.The organisation is additionally involved in community sustainability schemes such as 'solar streets' and car clubs. The organisation has a 'net zero carbon emissions policy' and employs a dedicated climate emergency project manager. |
Score |
6/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The town council has secured all the other funding needed for the project and have a contingency plan should they only receive a partial grant from the council. They have budgeted for ongoing costs and eventual replacements. They stated that they have the funding needed for the project already, therefore in line with the policy officers have deducted two points. |
Score |
4/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Improved economic and community wellbeing'. The applicant has provided a clear, relevant and well detailed response that addresses how a capital grant will provide better outcomes to the community at an excellent standard with some measurable outcomes identified. They have gone above expectations and fully integrated the project theme, as they have a clear understanding of this corporate priority and how their project aligns with our plan to launch a new community wellbeing strategy to encourage and support culture, leisure and arts. There has been evidence provided that the community have been involved in the project design, but officers would like to see stronger collaboration with local organisations. |
Score |
5/6 |
|||||||||||||||||
Financial and project management plans The town council advised they have the funding required for the project from their reserves suggesting they could contribute more, however they will use this as a contingency should they not be successful in securing a grant. They have a total bank balance of £516,875 and £3,385,415 in reserves, but they anticipate delivering capital projects totalling £3,050,000 over the next three years and require a minimum of £500,000 in their general reserves. An extremely robust project plan has been provided alongside a maintenance plan. Demand for services and other similar facilities The organisation have estimated that 10,000 residents will benefit from the project with an explanation as to how this has been calculated. This facility will cater for Henley residents, surrounding villages as well as tourists. The closest similar facilities in the district are in Wallingford and Benson. Internal Consultation
Climate: The climate team fully supports the town
council’s future plans to tackle the climate emergency. The
applicant recognises the opportunity to improve the biodiversity of
the site through the delivery of the project and through their
procurement process. Officers also support the use of suppliers who
have a sustainability policy, use recycled/sustainable materials,
recycle the old equipment it removes and use chemical free
processes.
Project completion within timeframe The original project start date requested was April 2024, however the town council were advised the earliest start date would be May 2024. Officers are confident that the project would be completed within the 24 month timeframe, but would like to reiterate that we will not pay retrospective costs before a grant decision is made. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS Officers have deducted two points as the organisation has stated they are able to fully fund this project. |
Total score |
26/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? The project will: 1. Improve on the facilities provided by the current playground 2. Provide a free-to-access facility for all, helping young families and those on low incomes 3. Improve the biodiversity of the area for the benefit of users and the wider community
The new playground will also address the current accessibility issues (see attached access audit) in the following ways: 1. Follow guidance from PiPA, Make Space for Girls and Fields in Trust as well as feedback from the public consultations and stakeholder engagement 2. New signage at both entrances, which will be more visual, at a better height, include contact details and locations of toilets and refreshments, and include a QR code to an online form to directly report any issues 3. New smooth, firm surfacing in the playground to give better access to accessible items 4. More accessible play items 5. More sensory play items 6. Increase 'private' spaces 7. Include more natural materials and planted areas 8. Include more challenging play items 9. Better seating including wheelchair-accessible picnic bench 10. A dedicated webpage for the playground 11. More provision for girls through increasing social spaces and providing an alternative entrance to improve sense of safety
The closest similar facilities in the district are in Wallingford (Crowmarsh Gifford) and Benson. This playground will be the closest facility of its kind for residents of Henley and surrounding villages. Henley is one of the most visited destinations in Oxfordshire and the playground is popular with visitors and tourists. Therefore, the playground benefits a much greater number of residents and visitors than similar projects. How do you know there is a need for your project? The Council carried out an initial public
consultation (see report attached) and will be carrying out a
further consultation on the final design. This will include
engagement with stakeholders of minority groups and vulnerable
users.
|
Community Benefit Questions from application form Who will benefit from your project? Currently c.1,200 Henley residents within 5-12
target age range for playground. Within 20-year life expectancy of
playground, this will be c.3,000 residents. In addition, there is
the benefit of a free public facility to the parents and other
family and carers accompanying the children (c.6,000 over 20 years)
plus approx. 10% additionally from surrounding villages where
Henley is the main centre. Total: 10,000.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. The elderly -
although not the target user of the play equipment, grandparents
are a frequent users of the playground, supervising grandchildren.
The project will provide better surfacing and more comfortable
seating, as well as a more play equipment to improve the quality
and duration of the visit.
|
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? - Attached is a summary of the Council's recent
and ongoing programme of environmental works.
|
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? Total annual budget - £12,500
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. The fundraising
plan is included within the project management plan (section 6).
This also details existing and anticipated large capital
commitments (also given below). |
Project theme – outcomes questions from application form What difference will your project make in your community? This project will help SODC deliver one of the
central pillars of the theme, as included in the SODC Corporate
Plan 2020-2024:
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. The Council has and will continue to work with the community in the project planning and implementation. This was through an initial public consultation to inform the tender specifications, and the consultation report (attached) demonstrates how feedback from the community has directly informed the design specifications. We will carry out a second public consultation, once a contractor has been chosen, to shape the final design. |
Aston Rowant Parish Council |
Ref |
SCAP23-24\33 |
Project Name: Play area upgrade and new equipment |
||
Project
Description: Aston Rowant
Parish Council is seeking to refurbish the Kingston Blount village
playground, the only playground located within the parish. The
project will deliver a safe and stimulating playground through the
removal of 25 year-old equipment that is damaged / in a state of
disrepair, with installation of new and engaging playground
equipment and the refurbishment of equipment in good working
condition that will be kept within the playground. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Aston Rowant |
||
Potential number of beneficiaries: 9,500 |
Project Finances
Organisations latest bank balance: £62,899
Previous community grants:
· SCAP21-22/52 Replacement Noticeboards £2,106 – grant offer declined. · SActive23\77 £1,000 (granted to Kingston Blount Park Fundraising Committee towards this project but not directly awarded to Aston Rowant Parish Council).
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project significantly improves an important community facility by refurbishing the playground and installing new equipment to cater for different age ranges and abilities. It also includes improving the adult gym equipment and creating a new outside seating area. Consideration has been given to all users including those that are disabled; an access audit has been carried out and associated actions have been highlighted. Substantial consultation has been carried out by the Kingston Blount fundraising park committee with the community. |
Score |
6/6 |
|||||||||||||||||
Community benefit The parish council estimates it will benefit 9,500 residents and the project will improve and provide a facility that is open to anyone to access. They have clearly demonstrated how the facility will be inclusive and accessible to all users.
|
Score |
6/6 |
|||||||||||||||||
Action on Climate Emergency The parish council has a briefing paper which includes a recommendation to declare a climate emergency and to set a target to become carbon neutral by 2030. However, there is no evidence of projects or actions completed by the organisation to mitigate or adapt to climate change, so unable to score higher than one point without further details of delivered actions. |
Score |
1/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The parish council has secured all the other funding needed for the project and have a contingency plan should they only receive a partial grant from the council. They have budgeted for ongoing costs using the parish precept but not for eventual replacements. |
Score |
5/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Improved economic and community wellbeing'. The applicant has provided a clear, relevant and well detailed response that addresses how a capital grant will provide better outcomes to the community at an excellent standard with some measurable outcomes identified. They have provided great examples of partnership working and collaborations with other organisations and the community, which is demonstrated by their fundraising activities. The project may also support local businesses by bringing in more customers to the local cafe and farm shop. |
Score |
6/6 |
|||||||||||||||||
Financial and project management plans The parish council is contributing £7,500 and fundraised a further £15,811, although their overall bank balance is £62,899 suggesting they could contribute more. £12,365 is in their general reserves which cannot be drawn upon as this is held as a six-month contingency and £18,000 is held in another ear marked reserves account for other projects. They have stated they have £11,614 in a national savings notice account, which could be drawn upon if necessary and £2,000 per annum has been earmarked for maintenance. A comprehensive and thorough fundraising plan has been submitted demonstrating how they aim to cover any funding shortfall and a brief project plan has been provided showing actions and delivery timescales. Demand for services and other similar facilities The parish council have estimated that 9,500 residents will benefit, however officers have been unable to determine how this has been calculated as the estimated population of Aston Rowant is 830. This is the only playground located in the parish and they anticipate it will attract more residents from surrounding towns and villages. Internal Consultation
Climate: The climate team fully supports the parish
councils future plans to tackle the climate emergency. Officers
would encourage the applicant to include tree planting and other
biodiversity enhancements as part of the wider project, making a
positive contribution to nature and carbon capture. We support the
use of suppliers who have a sustainability policy, use
recycled/sustainable materials, recycle the old equipment it
removes and use chemical free processes. There is no evidence
within the application that this has been a consideration in
selecting a preferred supplier. The parish council is also
encouraged to consider making a more detailed climate policy with a
clear action plan going forwards.
Project completion within timeframe The project is estimated to start in May and last for just over two months, so officers are confident that the project would be completed within the 12 month timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application.
The parish council is encouraged to consider providing an accessible picnic bench and a firm nonslip surface as opposed to a loose bark surface. |
Total score |
24/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes
What extra facilities, equipment or activities will this project provide? The projects’ purpose is to refurbish the existing playground by replacing broken and damaged equipment, add new facilities suitable for a wider age demographic, expand accessibility, and create an outdoor space for community benefit.
Community engagement determined that the core equipment to replace were the Jeep and two play centres. New equipment will include several new features - cargo net, climbing walls, fireman’s pole, ramps, hangout den, hand puzzles, wobble-bridge, climbing tunnel and enhanced features to improve imaginative play. These additions, along with the new zip wire and sensory panels, will significantly improve the capacity of the playground and expand the age demographic of its users. These features will also provide a more stimulating and challenging environment that offers more opportunities for children to learn and develop.
The project will improve inclusivity/accessibility through sensory panels, hand puzzles, widened gate access and incorporating wheelchair friendly bench seating adding to the existing provision of a basket swing and sound funnels. A hang-out seating space has also been included to provide a private place to interact.
The project will also refresh the existing outdoor adult gym equipment and create a new community seating area for all ages to use.
The playground, gym equipment and the proposed centralised social seating area is the only space of its kind within the parish. The pandemic encouraged young families to explore facilities not in their immediate communities and therefore the Kingston Blount playground, as well as being a significant community facility for the residents of the village, also attracts visitors from surrounding villages and local towns who wish to come to a quieter and more rural setting.
How do you know there is a need for your project? The existing playground was built in 1998 - at
25 years old, much equipment requires replacement. Feedback from
the community showed the playground is not adequately servicing
community needs and a requirement to provide equipment for a
broader age range and improve on accessibility. · an anonymised survey focusing on usage, strengths and weaknesses of the playground and key pieces of equipment was distributed to a targeted group of local parents and staff from the village nurseries · community-wide engagement: feedback and input was conducted via the village Facebook group (membership: 1,700) · focus groups: held with staff and children of one village nursery · one-to-one discussions: offered to the local community and held with a number of parents / nursery staff · regular updates shared with the local community (via Facebook, parish magazines, Parish Council meetings, village noticeboards)
The output from the community engagement has consistently recognised the need for new equipment to expand the age range of children who the playground can cater for, ensure the area is inclusive for all abilities via disabled access and focused equipment, and provide a safe and stimulating environment for play. Additionally, we aim to develop an area for social / community engagement / activities. This has been recognised in the design plans and through inclusion of bench seating. |
Community Benefit Questions from application form Who will benefit from your project? The new playground will benefit children’s
physical, mental and social wellbeing by providing physically
challenging play equipment that enhances their development,
socialising skills and confidence.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. The playground
and playing field is currently the only ‘open to all’
facility within the parish, accessible to low income families as
well as vulnerable and isolated individuals and the wider
community. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? We have a Climate Action/Emergency policy, recently adopted a copy of which is attached. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? £2,000 PA provided from Parish Precept for potential maintenance costs (held in Ear-Marked Reserves account), with continued funding from Play Area Committee activities to supplement. Out of this maintenance fund there will need to be at least £500 PA ear-marked to replace/renew the bark chipping floor covering to maintain the safety element.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. In addition to
the funds raised already (and still in the process of being raised)
by the Park Refurbishment Committee, the parish council have an
ear-marked reserve figure of £7,535 set aside for the Play
Area if there is any funding shortfall. If the grant is made,
and these funds are not required, the money will be held in reserve
for future maintenance costs, in addition to the annual reserve
top-up of £2,000 for that purpose. There is also
£11,614 in a National Savings Notice account which could be
drawn upon if necessary. |
Project theme – outcomes questions from application form What difference will your project make in your community? 1) Delivery of a safe, stimulating, accessible
playground; free for all children:
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. Aston Rowant Parish Council have been heavily
supported by the Kingston Blount Park Fundraising Committee
(KBPFCo) to deliver this project, including all fundraising
activities. The KBPFCo was formed by a group of parents from within
the parish who felt strongly about replacing the existing equipment
to provide a safe and stimulating play environment for local
children. |
River & Rowing Museum Foundation |
Ref |
SCAP23-24\55 |
Project Name: Ratty's Refuge Reimagined |
||
Project
Description: Tucked away
beside the Museum is Ratty’s Refuge, a secret garden that
desperately needs care, attention and funding to transform into a
thriving community garden and outdoor classroom. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Henley On Thames |
||
Potential number of beneficiaries: 5,000 |
Project Finances
Due to the additional information provided by the applicant, this table has been updated following the first publication of the board paper.
Organisations latest bank balance: £4,784,746
Previous community grants:
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project moderately improves a substantial community facility. It is the refurbishment of an existing museum garden to increase the accessibility and widen its use to become a multi-purpose community garden and outdoor classroom. Consultation has been invited from family visitors via a survey and the findings have been submitted in support of upgrading the garden area. Additional informal surveying of non-users highlighted the need for the provision of free access facilities. |
Score |
4/6 |
|||||||||||||||||
Community benefit As a community garden, it will be open and available for anyone to access, limited only by the museum opening hours and specific events. This project benefits a greater number of residents when compared to other projects in the same category. They have demonstrated how the facility will be inclusive and accessible to all users, e.g, offering free museum tickets to disadvantaged families through NOMAD and via their schools programme to children from economically and educationally disadvantaged communities. |
Score |
5/6 |
|||||||||||||||||
Action on Climate Emergency The organisation has implemented multiple Climate Emergency related activities as routine activities within the organisation’s workplan, including environmental education programmes, recycling, and energy efficient technology. They have a sustainability policy for the organisation and do not appear to have a formal forward plan, however they do state that they plan on investing in solar PVs. |
Score |
5/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation has got a funding plan but they haven't applied for all of it yet. They have secured £5,545 funding including their own contribution but this is less than 50 per cent of the balance. They have budgeted for contingency, routine maintenance via their volunteer scheme and eventual replacements. Although the organisation’s finances suggest they can afford the whole project, officers have not deducted two points because the museum’s endowment fund is specifically to preserve the building rather than for ancillary projects. The applicant has explained the necessity of fundraising for all future activities.
The organisation has provided additional evidence to confirm that they have secured £4,000 funding from Henley Town Council, so they now have all the other funding needed for the project, therefore officers recommend increasing the score to six points. |
Score |
2/6 6/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority
The project
theme selected is ‘Improved economic and community
wellbeing’. |
Score |
6/6 |
|||||||||||||||||
Financial and project management plans The museum was founded with an endowment fund specifically to preserve their building, held in investments (approx. £4,518,000). The endowment has been called upon to support the annual Museum deficit, which was £510,000 (before gains on investments) in 2022. They anticipate that the draw will increase in 2023/2024 due to the building project which is not yet complete, and associated temporary closure that resulted in no visitor income for nine months. They now need to fundraise for all future projects to enable them to reduce dependence on the endowment fund.
Demand for services and other similar facilities The River & Rowing Museum is a leading independent museum, with approximately 120,000 visitors per year. It is Henley town's museum but it attracts international appeal as the site of the national collection of rowing. They have estimated that 5,000 local residents will benefit from the project, significantly from Henley. Access to the community garden will be free for all. In addition, the aim is to deliver more structured use of the space and run nature/ art/ textile workshops. Specific events will be priced fairly in line with other comparable organisations. Internal Consultation Climate: Officers are unable to comment on the detail of the project without seeing evidence of their planting plan or design for the garden. There may be alternative options for creating wildflower meadows without using turf that would offer better value for money. To ensure that the garden doesn't again fall out of use and into disrepair, the applicant is recruiting dedicated volunteers to look after this space and will create a fund to help with ongoing repairs. Officers would also encourage engagement with local nature groups to make the most of this habitat for wildlife, encouraging visitors to learn from the wildlife friendly gardening techniques on display, and raise awareness of water vole conservation.
The applicant has now submitted a
design plan for their project.
S106: River & Rowing Museum Foundation have not applied for any S106 funding towards the project. There are no secured or available S106 developer contributions within the parish of Henley-on-Thames for use towards the project. Project completion within timeframe The project plan appears to be deliverable within the 12 month timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
22/30 26/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? Ratty’s Refuge transformation will have accessibility and learning at its heart to deliver maximum impact for our communities and users.
The current garden features a mosaic of habitats linked to Wind in the Willows characters, with a wooden animal figurine of each; from a pond and wildflower bankside for the water vole, ‘Ratty’, through to shady, wooded planting representing Badger’s Wild Wood home. Decking and log paths connect zones, but planting is overgrown and the paths now unsafe. The pond will be fenced and gated for safety, and paths upgraded to allow wheelchair access and with different visual and mobility needs taken into account. Repairs will be prioritised over replacement (e.g. on gabion seating or wooden animal figurines) to reduce the environmental impact of the project and to save on costs, creating a welcoming, engaging space. Planting will be replenished and updated to best suit the space, and fun, informative signage added. Utilising learning from the past iteration of this space and its functionality we can improve it to provide maximum benefit for our local communities and best value for money.
New areas and features will be added that are crucial to opening up access to the space and creating broader opportunities for engagement and learning. An outdoor classroom area with wooden chairs and easels will facilitate delivery of schools workshops and informal learning in the space. They can be used by community groups as a meeting place, for creative art or literature sessions taking direct inspiration from the wildlife all around, storytelling, or simply as an additional place for casual visitors to pause and appreciate the surroundings. Wooden activity points will open up areas for play and exercise. There is no comparable open-access provision for outdoors learning and structured engagement with native habitats in Henley.
How do you know there is a need for your project? Families are a key audience, and we anticipate
will also be significant users of the garden, validated by research
undertaken with family visitors. 90% of respondents confirmed that
use of a garden space would be attractive to them when thinking of
visiting. Unsurprisingly, play facilities were the most commonly
requested feature, including natural ones such as wooden climbing
activities. This was closely followed by provision of seating and
shelter, all aspects which are duly core to the re-design. We were
heartened to see children and adult respondents flagging up the
wildlife experiences they are keen to enjoy in the space, with
habitat creation and bug hotels sitting alongside the chance to
learn and get hands-on with nature. Wellbeing was another key
benefit respondents want, with sensory experiences and relaxation
frequently cited. Fragrant, beautiful flowers, particularly
wildflowers and native species were mentioned repeatedly, and both
children and adults wanted space to relax and appreciate
nature. |
Community Benefit Questions from application form Who will benefit from your project? Our local Henley community will benefit
significantly, with the transformed garden and outdoor classroom
providing a new and exciting facility for the town. As a community
garden, access will be free for all, only limited by our opening
hours and the delivery of specific events, such as school sessions
or workshops with local groups. Paid workshops will be priced
fairly in line with other comparable organisations and will
enable us to deliver more structured use of the space, for example
as an outdoor classroom space for adult textile or art workshops,
poetry sessions for teens, or wildlife exploration with our
under-5s group and after school Nature Club. With accessibility
being built in from the design stage, the new opportunities the
garden will provide can reach local residents of all ages and
abilities, as well as visitors coming to us from further
afield.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. We prioritise
working with SEND groups across our activities, and Ratty’s
Refuge will extend what we can do. We regularly host four students
from Henley College’s Pathways SEND programme, working across
a range of departments and activities within the Museum. With
Ratty’s Refuge transformed into an actively used, safe and
accessible space we will be able to add gardening activities to
their sessions and provide a richer and more varied experience,
with the associated health and wellbeing benefits of outdoors
activity and exercise. The new accessibility enhancements will also
open up the space to all visitors with limited mobility,
disabilities or impairments, in line with our 2023-26 Strategy.
Plenty of seating makes space for contemplation but also enables
visitors to be able to spend more time in the garden. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? We champion environmental sustainability through
our displays and the stories we tell, educating and inspiring our
visitors to take action to reduce their own impact on the
environment and to protect it for future generations. As such,
environmental sustainability and reducing our carbon footprint is
of central importance to us. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? Allocation of £1,500 per year for any
repair of any breakages and service of gates/safety equipment. This
will be raised from a combination of recurring grant funding,
increased income, and a small portion of internal budget. · We project increased revenue from having more schools on site as Ratty’s Refuge with its outdoor classroom facilities boosts our capacity. We look to reinvest this in the maintenance of the site. · Our recurring funding from Henley Town Council, which we are in the process of applying for the next three years of at present, will also contribute. In the unlikely event that the town council choose to discontinue their support we will apply for alternative external funders to meet any additional costs.
·
Our internal Operations budget can
also contribute a small proportion.
We’ll use our volunteers to complete
routine maintenance including tidying and light duties for looking
after the foliage. The cost of our volunteer scheme is covered in a
separate budget. There are therefore no specific costs related to
this project.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. Our current
bank balance is £160k, and we have £4,518k in
investments. Our cash commitments to the end of this financial year
including running costs and project costs are expected to be around
£650k. The Museum was founded with an endowment fund to
preserve our building, held in investments. It has been used as
such in 2023 for our vital multi-million pound building repair
works, without which we would have been unable to keep operating,
and for which we were unsuccessful in securing additional external
funding. However, the endowment has also been called upon to
support the annual Museum deficit, which was £510k (before
gains on investments) in 2022. This situation continues, and the
draw will be larger in 2023 and 2024 due to the building project
which is not yet complete, and associated temporary closure that
removed our visitor income for 9 months (numbers will be released
after the audited accounts are signed off by the Board). This
situation is not sustainable, and the Trustees and whole team are
working to aggressively reduce the deficit. |
Project theme – outcomes questions from application form What difference will your project make in your community? Ratty’s Refuge will deliver immersive,
multisensory learning opportunities, improving wellbeing and
accessible to all ages and abilities in our community. This haven
for wildlife within a subtly curated mosaic of habitats will
maximise our scope to foster a love and understanding of the
natural world, in line with our 2023-26 Strategy. Its outdoor
classroom provision will be a valuable asset for the town.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. We are passionate about partnership working and
the reciprocal benefits it delivers. We will be working with a
variety of local organisations on the delivery of activities that
Ratty’s Refuge will facilitate once complete, and so are
collaborating at the development stage to ensure it will meet their
needs. · Henley in Bloom will help with the ongoing maintenance of the garden, which will provide a beautiful addition to Henley’s floral tapestry. The group will help promote Ratty’s Refuge, signposting visitors to us who might not be aware of the Museum and its multisensory garden showcasing native natural habitats. · We have long worked with Henley College’s Pathways programme for SEND students, currently hosting four young people weekly for learning and work experience. They are keen to be involved in the gardening opportunities and will provide feedback as we develop the garden designs, ensuring it meets their user’s needs. · Our local schools are very important to us, and we work closely with them, offering bespoke schools workshops tailored to their needs for our closest partners. We will also be building feedback from them into the design stage to ensure that the outdoor classroom element works as effectively as possible. · The Chiltern Centre provide respite stays for adults with learning disabilities. We will be working with them to offer tailored access to the garden for its sensory and wellbeing benefits and again will be incorporating their needs as we develop the design. · Sonning Common Green Gym have been inspirational for us, with their structured environmental conservation activities that deliver intrinsic social and fitness benefits. We aim for Ratty’s Refuge to provide the nexus for a Henley Green Gym in their model. We are in discussions with them about how best to do this and their input is invaluable.
|
South Moreton Parish Council |
Ref |
SCAP23-24\59 |
Project Name: South Moreton Playground Enhancement |
||
Project
Description: The project
seeks to replace ageing playground equipment that has been deemed
unsafe, specifically swings for all ages (infant, child and adult).
Sadly we have had to remove existing equipment as it was deemed
unsafe in a recent ROSPA report and this means that there are now
no swings in the village and the functionality of the play ground
has been significantly reduced. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: South Moreton |
||
Potential number of beneficiaries: 400 |
Project Finances
Organisations latest bank balance: £14,500
Previous community grants:
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project moderately improves a community facility to install more accessible play equipment (double-bay flat and cradle swings), resulting in a play area which caters for more age groups. Substantial consultation has taken place with the local community/school which showed an overwhelming demand for improved playground facilities. |
Score |
4/6 |
|||||||||||||||||
Community benefit It is a play area that is open and accessible to all. The project in particular benefits young families and school children as there is no other community space in the village. It gives the local young community access to additional play equipment to support their physical wellbeing and coordination skills.
Additional information has been provided on how the project will have a significant impact on the health and wellbeing of older children by creating an area for them to socialise. It is especially valuable to teenage girls who will benefit from the installation of a 'double-bay flat' swing, therefore officers recommend increasing the score to six points. |
Score |
5/6 6/6 |
|||||||||||||||||
Action on Climate Emergency The organisation has implemented multiple or regular minor activities or services that contribute to the Climate Emergency and nature recovery, leaving areas unmown over the summer, to encourage wildflowers to grow and encourage pollinators, investing in tree planting and making improvements to local footpaths to encourage walking and reduce use of vehicles. There is no evidence of a simple climate action policy/statement for the organisation to score four points.
The applicant has provided additional information confirming new trees are being planted as part of the play area which officers support but are unable to increase the score based on this information. |
Score |
3/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation still needs to raise £3,951 for this project, which they are requesting from this panel. They will fund the remaining 50 per cent of the project. Ongoing maintenance has been budgeted for however there is no contingency plan set out in the event of any funding shortfall. |
Score |
4/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Improved economic and community wellbeing'. They have provided clear and relevant responses that address how the equipment will improve access, health and wellbeing, community integration and increased use of the area. Good examples have been provided regarding partnership working and how they have collaborated with the community to deliver the project. |
Score |
4/6 |
|||||||||||||||||
Financial and project management plans The organisation is contributing 50 per cent of the project themselves, part of which is CIL funds. They have a separate budget to cover the maintenance and repairs to the play area. Due to the size of the project, they did not need to supply a project management plan. Demand for services and other similar facilities They have estimated that 400 local residents will benefit and there is not another recreational facility of this nature in South Moreton. A village survey was conducted with overwhelming support for improvements to the play area be made.
The applicant has provided additional information, which as a result of community feedback, a new area/hub will be created, including a shelter for older children to interact and socialise. In addition, the new swing will be installed in this area for teenagers to enjoy and will be of particular value to teenage girls.
Internal Consultation Climate: Officers would encourage the applicant to include tree planting and other biodiversity enhancements as part of the wider project, making a positive contribution to nature and carbon capture. We support the use of suppliers who have a sustainability policy, use recycled/sustainable materials, recycle the old equipment it removes and use chemical free processes. There is some evidence within the application that this has been a consideration in selecting a preferred supplier - through selection of swings which are made from sustainably sourced timber. The parish council is also encouraged to consider making a climate policy and action plan going forwards.
The applicant has
provided additional information about climate initiatives that have
already taken place at the play area, including planting 85 trees,
an orchard, loop path and planting a wildflower
area. Project completion within timeframe The project is expected to last for four months so officers are confident that the project would be completed within the 12 month timeline. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
20/30 21/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? Provision of two sets of new swings (with safety mats), replacing other swings that have been decommissioned for safety reasons. As a result of removing the existing swings, there are no other swings in the village which includes the local primary school (which had been using the swings in the recreation ground). In the last year our local bus service has been cancelled and there are no pavements connecting South Moreton with other villages therefore access to swings in neighbouring villages is very difficult for residents.
How do you know there is a need for your project? As a result of recent village surveys (with
feedback from over 100 residents), there is an overwhelming demand
for improved playground facilities, including these swings. This
was reinforced at a recent village event to celebrate improvement
that have been made over the last 12 months which has driven a
renewed interest in further developing the playground. |
Community Benefit Questions from application form Who will benefit from your project? South Moreton Parish Council represents the 366 village residents, trying to make the peoples visions become reality. This project will help the 82 children that our village is home to, as well as their families with free to access to local activities. Furthermore, the village school is also supportive of this project as it will help their 128 pupils to be active during school, after school and in the school holidays and weekends. This will help their learning, as the school find that children who don’t have the opportunity to be active in school holidays perform at a lower level upon their return to School.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. At the moment there is not access to swings or similar facilities for any children in the community. This projects rectifies that, especially given the improvements that have been made to access thanks to an SODC capital grant (& other significant fund raising efforts) in the last year that paid for a new path to the playground and wider recreation ground.
|
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? As a parish council and village, we are deeply
committed to reducing our environmental footprint in the local area
and therefore focusing effort to contribute to mitigating future
climate challenges. Actions in relation to the area around the
playground include: · Leaving wild areas to grow during spring/ summer to benefit wildlife and enhance bio diversity · Agreed not to cut road-side verges to save fuel and increase bio diversity · Investing in an ambitions tree planting scheme, majority funded by local residents · Proactive management of local footpaths to encourage walking and reduce use of vehicle We have ensured that the swings we have
identified are made from sustainably sourced timber to minimise the
impact on the area. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? N/A - maintenance of the playground is already provisioned for. Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. N/A - Match
funding is coming from parish council savings (inc community
infrastructure levy) which is separate from the funding required to
run/ manage the parish. |
Project theme – outcomes questions from application form What difference will your project make in your community? The key intended outcomes of this project for
the local community, along with expected measures/ evidence, are
captured below: · Improved access and community integration for local residents as a result of a improved collaborative facilities Measures/ Evidence: Feedback in village surveys, comments at village/ parish meetings
·
Improved health and both physical
and mental well-being of local residents as a result of a new
swings. Measures/ Evidence: Increased visible use of the Recreation
Ground and playground (by all local residents), reduced sickness/
absence in village primary school, feedback in village
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. Design of the project has been done through a
collaboration between the parish council and local residents as
well as through engagement with Governors from the local primary
school. We have formed a local recreation committee and working
parties that have already played an active part in planning for the
work. · Local residents to help remove swings · A local resident to project management the construction activity · Support with installation of the new swings |
Kidmore End and Sonning Common Parochial Church Council |
Ref |
SCAP23-24\29 |
Project Name: Roof replacement and energy efficiency measures. |
||
Project
Description: We have the
original roof and it is time expired. To get through the coming
winter we have had to spend £2,500 on temporary repairs. We
are at the stage where we are patching patches. Additionally, the
building was designed at a time when the roof was seen as the means
of keeping water out. It was not seen as a means of keeping heat
in. |
||
Application Theme: Protect and restore our natural world |
||
Location of Project: Sonning Common |
||
Potential number of beneficiaries: 1,000 |
Project Finances
Organisations latest bank balance: £500,726
Previous community grants: None
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project significantly improves a community facility by replacing the existing leaking roof of the church with a new insulated roof as well as installing PV panels. Consultation has taken place in the form of an open day publicised in the local paper as well as direct consultation with those who currently hire the hall within the church. They have indicated there is a need for this venue for the community to hire by carrying out a community mapping exercise, but no evidence has been provided. Officers are concerned that an access audit was completed which highlighted they would not be in favour of other faith groups hiring the venue, so officers would seek reassurance that the facility is available for all. |
Score |
4/6 |
|||||||||||||||||
Community benefit The organisation stated the project will benefit approximately 1,000 residents as it is community facility that is available to hire and it has also been designated as a refuge centre by the parish council. They have plans to increase their visibility by developing a web-based calendar to provide better information for potential hirers. Officers have not scored this higher than four points, due to concerns that the access audit appears to restrict other faith groups renting the space. |
Score |
4/6 |
|||||||||||||||||
Action on Climate Emergency The organisation has excellent plans to tackle the climate emergency, including the current major project. We welcome the proposals to carry out an energy audit, as well as planting, water saving and involvement in the Eco Church movement. As evidence is not available of projects delivered to date only a score of two is possible. This score reflects the substantial ambition rather than projects already completed. |
Score |
2/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation has secured over 50 per cent of the project balance and included a contingency plan. They have budgeted for ongoing maintenance costs and identified how to create a fund for an eventual replacement. |
Score |
4/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The applicant selected multiple project themes and has been scored against 'Action on the Climate Emergency'. This roof replacement project with insulation and solar energy makes a clear contribution to tackling the climate emergency. The overall project has measurable outcomes and good community engagement. For the council’s own properties it is normally concluded that solar thermal would compete with solar PV for roof space and solar PV would tend to provide a more cost-effective solution. It is possible that the church has different requirements and a different conclusion may be reached. The applicant's plans for tree planting and wildflowers are a minor part of the project and no detailed plans have been included to provide comment. |
Score |
5/6 |
|||||||||||||||||
Financial and project management plans The original project cost submitted was £253,000 but as this included VAT the cost was reduced to £211,000. Note: there are no actual quotations for this project, only a quantity surveyor report. The surveyor report does not appear to include a battery which is part of the project description. The organisation is contributing £115,000 and they have a clear funding plan on how to bridge the gap, although they haven’t applied for all of the funds yet. The project plan submitted shows draft delivery timescales but officers would expect to see a more robust and detailed plan for a project of this size. Demand for services and other similar facilities The organisation have estimated it will benefit approximately 1,000 residents. There is a local Sonning Common village hall and Kidmore End War memorial hall that can be hired, however these venues are often fully booked. Internal Consultation
Climate: The climate team fully supports the
church’s future plans to tackle the climate emergency. Project completion within timeframe The project is expected to complete within three months starting in May 2024. Officers note that if any of the grant applications are unsuccessful it could impact the start date, but the project should have no issues completing within the 12 month timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS
No points have been deducted from
this application. Suggested conditions:
· The facility is available to hire for anyone regardless of faith group. The applicant provided additional information regarding their equalities policy, however unfortunately this information has not completely reassured officers that the facility will be open to all, therefore officers recommend that this condition remains. · A detailed project plan is to be submitted prior to funding being released for the project. · Two detailed quotations for the project are provided. |
Total score |
19/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? No How do you know there is a need for your project? The first indicator of need is water entering
the building through the roof. This has been patch repaired but is
only a temporary measure. This was followed by the second
indicator - comments from hall hirers. It does create a good
ambience when there are buckets! We suspect that it is only the
shortage of other venues that enabled us to keep some hirers. We
want a better relationship, with them, than "there is nowhere
else". |
Community Benefit Questions from application form Who will benefit from your project? Our current hirers are Jo Cassell's Keep Fit
Group, Sonning Common WI, Caroline Kanerick's Literacy Group, Kelly
Westwater Dance, Stevie Whittington's Art Group, and in the recent
past Functional Pilates and U3A Photography Group.We also have many
one off hires. One of these (dance) is increasingly frequent and we
expect that it will become a regular booking from early in the New
Year (regular hirers get priority over one off hires as we can sat
that the hall is booked).
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. We have
considered how the project will improve access to all (including
those who are listed above). A roof, in itself, will not increase
access. However, this roof will enable access to be maintained. It
will also enable access to be affordable. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? This project is a key commitment to
environmental sustainability. The majority of heat loss, from any
building, is through the roof. Our 1960's roof has minimal
insulation which is effectively none at all. The new roof will have
C21 insulation installed. This will reduce carbon emissions
considerably as well as improving comfort. The Church of England has a target of being Net
Zero by 2030. We are but a small part but see that the care of
creation is of vital importance. Through our support of Christian
Aid and other charities we are very aware of the effect of rising
water levels, and changing heat maps, on many communities
overseas. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? We have a regular income from giving by Church
members and hirings. To date these have covered day to day running
costs. With a probably reduction in running costs this position
will improve. We have also been able to meet small maintenance
costs, statutory inspection costs and minor upgrade costs.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. Our annual
accounts, attached with this application, show the level of
commitments that we currently have. We share the costs of a
Benefice Administrator (paying 50% of her six hours a week). |
Project theme – outcomes questions from application form What difference will your project make in your community? We manage to meet elements of all four themes.
In order, as printed, these are
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. We have been working with Sonning Common Parish
Council as well as the hirers of the building - all of which are
locally based and provide activity for local people. |
Chinnor Village Centre |
Ref |
SCAP23-24\35 |
Project Name: Keeping the Lights On-Upgrade to LED Lights |
||
Project
Description: Project to
improve Energy Efficiency across the centre to reduce running cost
and be more environmentally friendly. The Centre has under taken a
review since covid on how to become more sustainable and reduce the
impact of using the Charities reserves to continue to operate. Part
of this plan is to reduce running costs in particular lighting and
heating with increased utility rates over the last 18 months. This application seeks to complete the transformation to LED. |
||
Application Theme: Action on the climate emergency |
||
Location of Project: Chinnor |
||
Potential number of beneficiaries: 270 |
Project Finances
* This figure has been adjusted pro rata from an external grant application made covering the whole project, however part of it did not pass the eligibility criteria for the grant scheme.
Organisations latest bank balance: £146,236
Previous community grants:
· SActive23\80 Chinnor Village Centre Health and Wellbeing project £1,000 – grant ongoing (12 months project completion not expired). · SActive22\160 Alexandra Technique for Friendship Club £1,000 – grant ongoing (12 months project completion not expired). · SRev22-24/ 33 Create a centre of excellence and growing day care attendance capacity and room hire fill rate £125,000 - grant application unsuccessful. · CGS21-22/216 Chinnor Village Centre – Living well after a stroke £600 – grant complete. · CGS21-22/66 Improvements to a Community Building for the Elderly (2021) – replace sky lights - £5,000 - grant ongoing (monitoring report reminder sent). · CGSCHI1\14 Furniture replacement £1,224 – grant complete. · CGSCHI2\7 Village Centre equipment upgrade £4,995 – grant complete. · CGS23-24/149 Access ramp replacement £5,648 – grant accepted.
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation It is a project that moderately improves a substantial community facility that provides a community hub, including day care, warm space, community cafe and minibus service. Substantial consultation has taken place with service users, support groups and community partners as detailed in the 'Community Engagement Plan' provided. The project will improve the energy efficiency of the centre and help reduce running costs. |
Score |
4/6 |
|||||||||||||||||
Community benefit The project improves and sustains a community building which will indirectly benefit local elderly residents and support groups. They have increased access to the Centre to other groups and aim to widen their programme to support more vulnerable adults in general. It is a facility that promotes social cohesion to help reduce social and rural isolation. |
Score |
3/6 |
|||||||||||||||||
Action on Climate Emergency This organisation has taken major action on the climate emergency but has no simple climate policy. However, changing from gas to electric heating is one of the most important decarbonisation actions that can be taken. Together with installation of solar PV and other minor actions such as a wildlife garden and equipment reuse, this justifies a score of four. |
Score |
4/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation have provided a simple funding plan which details their own contribution of £1,218 (less than 50 per cent of the project costs) and have applied to the parish council for a further £2,460 which, if successful, along with their request to this scheme would more than cover the whole project. They have budgeted for ongoing costs and eventual replacement of lights in their three-year budgeting plan. |
Score |
2/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Action on the climate emergency'. The installation of LED lighting is a valuable energy efficiency measure with a clear contribution to tacking the climate emergency. The project has measurable outcomes and good community engagement. |
Score |
5/6 |
|||||||||||||||||
Financial and project management plans The organisation is in a strong financial position and have provided a robust three-year financial forecast. They are contributing £1,218 towards the project and have also applied for a grant from Chinnor Parish Council, yet to be secured. This project will help reduce overheads and sustain financial stability. Due to the size of the project, they did not need to supply a project management plan. Demand for services and other similar facilities The application indicates that the Centre serves a population of over 7,000 and is considered a hub of the community which directly benefits 270 residents. With a local ageing population, they predict that demand for their services will grow, with the aim of expanding their range of services to encourage more individuals to visit and reduce social isolation. Internal Consultation
Climate: The Village Centre is making good progress in
tackling the Climate Emergency. The Centre is encouraged to
consider agreeing a climate policy and action plan going
forwards. Project completion within timeframe The project is on a small scale and given the organisation's contribution and financial position, officers feel the project is likely to start and complete within 12 months of any award being made. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS The organisation has a healthy bank balance so could fund the project themselves and as a result points could be deducted however as the grant sought is low value, no points have been deducted from this application.
Please note 'change of name' for the project as the other element (Driveway access ramp improvements access) did not pass eligibility criteria under this grant scheme. However, a grant application has been submitted for this project to the South Councillor 2023/24 grants scheme and a grant of £5,648 has been awarded. |
Total score |
18/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses – officers have removed responses relating to the access ramp improvements that are ineligible for this scheme |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? No How do you know there is a need for your project? The Centre has seen rising running costs over
the last 2 years due to increased utility bills and the cost of
living crisis is affecting our community. There will be an
increased need again this winter to provide safe, warm spaces for
our most vulnerable in the community. |
Community Benefit Questions from application form Who will benefit from your project? Chinnor Village Centre is considered the hub of
the community and is unique in terms of providing opportunities for
individuals or groups to meet in a comfortable; safe environment;
sharing interests with access to subsidised refreshments.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. The Centre has
worked hard since covid; to build participant’s self
confidence in leaving their home; mixing with other people and
taking part in activities. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? Trustees have worked hard to produce 3 year
financial management plan to ensure the future sustainability of
the centre. Reducing running cost by being environmentally friendly
and reducing waste is key. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? Ongoing costs for the lighting is budgeted
within our 3 year income and expenditure forecast with assumptions
based on future increases in utility costs. It is hoped that when
the LED work is complete that there should not be any planned
maintenance for the next 12 months. The centre has reviewed its charges over the next 3 years as well as produced a 3 year Community Enagement Plan to attract new members of the community to use the facility, increase footfall and ensure the centre is more sustainable going forwards.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. The centre has
worked with a financial consultant to produce a 3 year budget and
identify how it can be more sustainable going forwards and not need
to use its reserves. Reserves have been used the last 2 years where
the centre has made a loss. The Charity is fundraising towards the
anticipated shortfall in our next 12 month budget which covers
mostly increased staff costs, increased overheads in the cafe and
anticipated reduction in income from our activities and rising
utility costs. |
Project theme – outcomes questions from application form What difference will your project make in your community? Securing the partnership funding from Chinnor
Parish Council.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. Current and proposed partnerships as
follows;
|
Parochial Church Council North Moreton |
Ref |
SCAP23-24\42 |
Project Name: Safe and More Efficient Use of Village Hall |
||
Project
Description: Replacement
of External Doors and Windows to improve thermal efficiency. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: North Moreton |
||
Potential number of beneficiaries: 200 |
Project Finances
Due to the additional information provided by the applicant, this table has been updated following the first publication of the board paper.
Organisations latest bank balance: £90,777
Previous community grants: None
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation This project significantly improves a community facility to increase capacity. Full consideration has been given to all users including those who are disabled; an access audit has been carried out and associated actions have been highlighted. Consultation has been carried out with existing users of the village hall and the majority of households in North and South Moreton. |
Score |
4/6 |
|||||||||||||||||
Community benefit The project will improve a community building that is available for anyone to access. There are a number of community groups who use the hall including Ukrainian refugees who use it as a meeting place for support. The proposed works consider how the facility will be inclusive and accessible to all users, in particular, improving the accessibility for individuals with disabilities and impairments. |
Score |
6/6 |
|||||||||||||||||
Action on Climate Emergency An energy audit has been conducted for the building but no action has yet been taken following this. Some small other actions to address the climate emergency have been taken before, such as hosting a clothing recycling unit.
The applicant has provided additional information stating that another service provider has been identified for their clothing recycling unit and a replacement is now in place. However officers are unable to increase the score based on this information. |
Score |
2/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation have a robust funding plan with a contingency plan, however, they haven't applied for all of it yet. They have secured just under 50 per cent of the total project cost so far. The ongoing maintenance and cleaning are already incurred in running the hall.
The applicant has provided additional evidence that they have now secured £12,771 plus their own contribution of £19,700 which equates to £32,471 and this is over 50 per cent of the balance, therefore officers recommend increasing the score to three points. They still need to secure £3,339 to cover all the funding needed for the project, and do not mention how they will fund eventual replacements. |
Score |
2/6 3/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority
The project theme selected is
‘Improved economic and community
wellbeing’. |
Score |
4/6 |
|||||||||||||||||
Financial and project management plans A comprehensive funding plan/ small contingency has been submitted demonstrating how they aim to cover the outstanding amount in funding the project. North Moreton Parochial Church Council have designated village hall funds (as reported to the Charity Commission) and the North Moreton Village Hall Management Committee have the responsibility, delegated from the Parochial Church Council, to run and maintain the village hall for the benefit and use of the wider community. Their project plan appears to be deliverable within the timeframe. Demand for services and other similar facilities The organisation has estimated that 200 local residents will benefit from the project. This includes beneficiaries from the adjoining village of South Moreton as it does not have a village hall. Internal Consultation
Climate: This project will directly improve the energy
efficiency of North Moreton Village Hall which will reduce both the
carbon footprint and the energy bills of the building. The
applicant is following the recommendations of an energy audit for
the building. The PCC is encouraged to consider agreeing a climate
policy and action plan for the organisation going
forwards. Equalities: Equalities support their request for funding. They have provided Access Audits and comments which is very impressive and shows they think about accessibility to all.
Project completion within timeframe Even though the applicant has funding left to secure, they have a robust funding plan so officers are reassured that that project would be completed within the 12 month timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
18/30 19/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? The project will take away an unsafe and unusable stage which will be replaced by a stable floor thus increasing the usable floor area by 32% with consistent floor levels throughout. Accessibility will be increased thus supporting a safe environment for users. The floor will be constructed so that books for the bi-annual book sale can be safely stored as well as allowing for secure storage of materials for regular hirers. The survey supported using the stage area for more beneficial use. How do you know there is a need for your project? A survey/questionnaire was distributed to the residents of South Moreton and North Moreton. This concluded that the stage was no longer required but that other events were desirable. The survey confirmed that the local community valued the hall and brought forward offers of future help. |
Community Benefit Questions from application form Who will benefit from your project? Womens' Institute
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. Ukrainian refugees are given regular support and are allowed to meet. Replacement of the old wooden doors with modern maintenance-free doors will make it easier and safer for disabled people to access/leave the hall to participate in village events. Disabled and visually impaired users will benefit from a level flooring throughout and easy access to storage areas. Lighting, handrails, ramps and an accessible toilet are already in place. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? Replacement of draughty First World War entrance
doors and time expired windows to reduce energy consumption. The
project will contribute towards cutting green house gas emissions
by reducing the energy consumption of the building. The energy
audit report noted that we could expect a saving or around 946kWh
per annum with an expected lifetime of c. 15 to 20 years for the
windows and doors. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? No ongoing costs as the capital assets will be in place and maintenance free apart from window cleaning and floor cleaning which are already incurred in running the hall. Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. Normal costs of running the hall which are covered by hire income |
Project theme – outcomes questions from application form What difference will your project make in your community? Key outcomes will be:
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. A good response (71) from the survey supported
the continuing use of the Hall as a meeting place for social and
educational events. This encompassed the adjoining village of South
Moreton that does not have a village hall. The North Moreton Parish
Council supports the aims and activities of the Village Hall
Committee who give their free time and skills in maintaining the
hall, its pathways and lawn area. Engagement through the survey
resulted in offers of support and involvement in an improved
hall. |
Berinsfield Parish council |
Ref |
SCAP23-24\54 |
Project Name: New high pedestal slide |
||
Project Description: The parish council would like to purchase a new item of play equipment for the existing play area. The only slide on the site currently is suitable for children up to 5 years, but the site is available for young people up to the age of 12 years. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Berinsfield |
||
Potential number of beneficiaries: 1,000 |
Project Finances
Organisations latest bank balance: £294,262
Previous community grants:
· BGV22-23\25 Improvements in Berinsfield Burial Ground £34,518 – grant complete. · BGV22-23\30 Berinsfield Neighbourhood Development Plan £7,000 – grant ongoing. · CGS22\100052 Provision of flagpole and Union Jack flag in Berinsfield £1,263 – grant ongoing. · Sactive22\105 Rugby in Berinsfield £1,000 – grant ongoing. · CGS20-21/112 New defibrillator to be installed outside the Pavilion £1,390 – grant complete. · CGS21-22/58 New piece of play equipment for Lay Avenue Play Area £3,238 – grant ongoing. · CGSB\2 Defibrillator £856 – grant complete. · SC17-18/33 Lodden Avenue Play Area, Berinsfield £33,922 – grant complete. · SCAP19-21/53 Provision of outdoor gymnastics equipment £10,000 – grant complete. · SCCG/66 Purchase two new Marquees £1,225 – grant complete. · SCAP22-23\100055 Installation of Solar Panels on the Sports Pavilion £11,261 – grant ongoing. · SActive23\59 Purchase of rugby goal posts £1,000 – grant ongoing. · CGS23-24/115 Installation of rugby posts £1,000 – grant ongoing.
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project provides a new minor facility for the community by installing a new slide in an existing playground that will cater for more ages. There is an existing slide that caters for children up to the age of 5 and the new slide will cater for children up to the age of 12. The decision to undertake the project has been taken by the parish council, but no evidence of further consultation has been provided. |
Score |
3/6 |
|||||||||||||||||
Community benefit The project will provide a facility that is open to anyone to access and will benefit approximately 1,000 residents. It will encourage social cohesion for some priority groups such as isolated young families, migrants and economically and educationally disadvantaged individuals. |
Score |
5/6 |
|||||||||||||||||
Action on Climate Emergency The organisation has given some consideration into possible actions that address the Climate Emergency and nature recovery, including research into improving the energy efficiency of a building it owns, as well as leaving an area on the recreation ground unmown over the summer, to encourage wildflowers to grow and encourage pollinators. |
Score |
2/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The parish council have applied for all the other funding needed for the project as they are funding 50 per cent of the project balance and they've budgeted for ongoing costs. They do not have a contingency plan in place should they only receive a partial grant. |
Score |
4/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Improved economic and community wellbeing'. The applicant has provided a clear and relevant response that addresses how a capital grant will provide better outcomes to the community at a good standard. It will have a positive impact on young peoples mental health but there does not appear to be any partnership working or community engagement. |
Score |
3/6 |
|||||||||||||||||
Financial and project management plans Berinsfield Parish Council will contribute £5,741 towards the project which is 50 per cent of the total cost. Officers note that they have this amount in their 2023-24 budget but are able to carry it over to the year 2024-25 for the purchase and installation of the slide. Due to the size of the grant request, no project plan is required. The parish council includes funds in its budget to ensure the maintenance of play equipment. Demand for services and other similar facilities The parish council estimate that 1,000 residents will benefit from this project. The Lodden Avenue play area is used by young people living in Berinsfield, children visiting the village, young spectators who attend football matches and the children from Abbey Woods Academy. The applicant states that the only slide on the site is suitable for children up to 5 years, but the play area is available for young people up to the age of 12 years. Internal Consultation
Climate: Officers would encourage the applicant to
include tree planting and other biodiversity enhancements as part
of a wider project, making a positive contribution to nature and
carbon capture. We support the use of suppliers who have a
sustainability policy, use recycled/sustainable materials, recycle
the old equipment it removes and use chemical free processes. There
is some evidence within the application that this has been a
consideration in selecting a preferred supplier - through selection
of a slide which is expected to have a long life. The parish
council is also encouraged to consider making a climate policy and
action plan going forwards. Project completion within timeframe The project is expected to complete within four days starting in June 2024. The project should have no issues completing within the 12 month timeframe of this grant scheme, subject to raising additional funds if they do not receive the full grant requested. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
17/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? The parish council would like to improve the Lodden Avenue play area by including a High Pedestal slide. There is currently only a slide suitable for young children in the play area. The slide from Wicksteed Leisure is the most suitable as it is made of metal and is substantial enough for the environment. How do you know there is a need for your project? The slide will provide play value for 5 - 12 year old children. This would be the only high slide and will be located with other equipment more suited to 5 - 12 year olds rather than for toddlers and younger children. The selection of the High Pedestal Slide was made by the parish council at its meeting held on 2nd October. There is limited space in the play area therefore a static piece of equipment would fit in. |
Community Benefit Questions from application form Who will benefit from your project? The Lodden Avenue play area is used by young people living in the village, children visiting the village, young spectators who attend football matches and the children from Abbey Woods Academy.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. The provision of the High Pedestal Slide will improve access for isolated young families, migrants, economically or educationally disadvantaged individuals. Hopefully we do not have any homeless children in Berinsfield. The Slide may be suitable for individuals with disabilities, depending on the nature of the disability. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? The High Pedestal Slide would be provided in
addition to the existing five year old play equipment in the Lodden
Avenue Play Area. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? Berinsfield Parish Council will inspect and maintain the equipment and it is expected to have a fairly long life as it is made of metal by a reputable manufacturer. The parish council always includes funds in its budget to ensure the maintenance of play equipment
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. The parish council does not have any financial commitments that would prevent it contributing £5740.40 towards the cost of the purchase and installation of the slide |
Project theme – outcomes questions from application form What difference will your project make in your community? The provision of the High Pedestal Slide will provide another form of exercise for young people up to the age of 12 years. It will encourage them to be out in the fresh air in a safe environment away from main roads. It could have an impact on their mental health and will encourage them to speak to their peers rather than communicating on their mobile 'phones.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. The parish council will not be collaborating with any other organisations to provide the High Pedestal Slide. It is essential that all play equipment is installed by qualified installers and checked by RoSPA therefore it is not possible to engage unqualified volunteers to help with the project. |
Thame Town Cricket Club Limited |
Ref |
SCAP23-24\67 |
Project Name: Solar Panels controls housing |
||
Project
Description: The large
increase in utilities costs in the past twelve months has had a
major effect on the financial viability of all the groups and local
users of our community facilities at Thame Town Cricket Club, and
on the costs of the club itself. For this reason we decided to fit
an array of solar panels on the roof of our new building, which is
well-suited to take this equipment. This installation will help
reduce the cost of the electricity used in the building, and at
times will feed power back to the grid, thus providing a
self-sustaining and green solution to our energy requirements in
this new facility. |
||
Application Theme: Action on the climate emergency |
||
Location of Project: Thame |
||
Potential number of beneficiaries: 500 |
Project Finances
Organisations latest bank balance: £56,664
Previous community grants:
· Volgrant/57 Volunteers £750 - grant complete. · CU15k£\620 New cricket nets £5,671 – grant complete. · SCap16\102 Multi Sport and Multi Partner Clubhouse redevelopment £250,000 (awarded to Thame Town Council for this facility) – grant complete. · SCCG/119 Contribution towards new practice nets and cage surround £1,650 – grant complete. · CGS2R\100126 Installation of Solar Panels on Thame Town Cricket Clubhouse £8,000 – grant application unsuccessful.
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation Little additional use will be gained by this project as it is to install a structure to house batteries for solar panels that are already installed. It will allow existing activities to continue and the club stated consultation has taken place with existing users and the town council, but no evidence has been provided. |
Score |
1/6 |
|||||||||||||||||
Community benefit The organisation stated the project will benefit approximately 500 residents as it is anticipated that it will reduce operating costs which can be passed on to other community groups using the building. These activities are all managed by the Club, so this project will indirectly benefit the community. |
Score |
1/6 |
|||||||||||||||||
Action on Climate Emergency This organisation has taken major action on the climate emergency but has no simple climate policy. The specification of an energy efficient new building meeting the BREEAM Excellent standard shows significant commitment. Together with installation of solar PV and other minor actions such as a waste recycling, this justifies a score of four. |
Score |
4/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation has secured all the other funding needed for the project and they have a brief contingency plan to seek alternative fundraising if they should only receive a partial grant. They have budgeted for maintenance costs. |
Score |
5/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Action on the Climate Emergency'. This is a small project which provides a vital contribution to a larger solar PV installation. As such it makes a clear contribution to tackling the climate emergency. The overall project has measurable outcomes and good community engagement. |
Score |
5/6 |
|||||||||||||||||
Financial and project management plans This is an extension project following their large solar PV installation and an additional expense to the original budget estimate. They have an existing Sport England loan to cover the balance of the cost of the solar panel installation but are unable to extend this loan to cover the housing facility. Thame Cricket Club is able to contribute 50 per cent of their own funds towards the total project cost of £2,400. They estimate that with the additional cost of this project and based on the savings achieved in electricity bills, the pay-back time will be six years. Officers note that the club anticipates that they will be in an improved financial position in the future as the overall solar project will result in reduced electricity costs. Due to the size of the grant request, no project plan is required. Demand for services and other similar facilities The organisation have estimated that 500 residents will benefit from this project however, officers feel that housing for solar panels controls is primarily for the benefit of club committee members who manage and ensure the security of the sports pavilion and community centre at Church Meadow, Thame. Internal Consultation
Climate: The Cricket Club is making good progress in
tackling the Climate Emergency. The Club is encouraged to consider
making a climate policy and action plan going forwards. The Club is
also encouraged to be more proactive in sharing their building as a
good practice example. Project completion within timeframe It is estimated that this project will take two months to complete although the applicant envisages a delay to the start date if they are unsuccessful with the Capital grant and need to seek external funding. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
16/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? The solar panels will substantially reduce the electricity costs at the pavilion. We recharge utility costs to some of our occupiers and this project will have a significant impact on these community organisations costs and cash flows. For example, the Thame Senior Friendship Centre, our main occupier, has two large freezers and an air-conditioning system which all consume electricity and operate 24/7 even when the Centre is not in occupation. The project will therefore improve the existing facilities for our community occupiers. How do you know there is a need for your project? We have consulted our occupiers and Thame Town Council before initiating the project, and received 100% support for the project. |
Community Benefit Questions from application form Who will benefit from your project? Thame Town Cricket Club
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. Our main
occupier is Thame Senior Friendship Centre who occupy the first
floor on Tuesdays, Wednesdays and Fridays, 50 weeks per
year. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? The solar panels project is the most obvious
demonstration of the Club's commitment to climate action, as we aim
to reduce the cost of our electricity consumption by 40% in 2024
and going forward. By generating our own electricity we can not
only reduce our consumption and that of our occupiers, but also
transfer surplus back to the grid. The 39 panels that are installed
are an initiative that other clubs and organisations are showing
interest in, and we are happy to explain the process to all
enquiries. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? There will be an annual maintenance regime for
the panels and roof mounted equipment, but the batteries and
inverters will not require maintenance.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. The solar
panels were funded by a Sport England grant (£10,000), and we
have taken out a Sport England loan to cover the balance of the
costs of the £21,000 panels installation. It is not possible
to increase this loan so the Club has agreed to fund the balance of
the cost of the housing installation from our own
resources/savings. |
Project theme – outcomes questions from application form What difference will your project make in your community? This specific project will extend the
operational life of the batteries and inverters by providing
weather protection and shelter from potential damage and
breakdown.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. We have received support from Thame Town
Council, Oxfordshire County Council, Sport England and various
energy efficiency bodies who have advised and consulted to achieve
this installation. |
South Stoke Community Shop |
Ref |
SCAP23-24\46 |
Project Name: Community Shop Rebuild Project |
||
Project Description: South Stoke Community Shop has been operating out of a converted shipping container for the past 10 years. We have planned approval for a beautiful new facility to provide wider groceries shopping, newspaper and cafe services and other hugely valuable to the the thriving village of South Stoke. We are not for profit organisation who truly serve the community, largely run by volunteers we provide essential and local shopping to those with limited access to travel, reducing food miles and provide food ordering and delivery services to those most in need |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: South Stoke |
||
Potential number of beneficiaries: 500 |
Project Finances
* No grant scheme details have been provided for £100,000 ** Applied to the UK Shared Prosperity Funding scheme administered by South Oxfordshire District Council, for which an award decision is yet to be made.
Organisations latest bank balance: £10,000
Previous community grants: None
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project will significantly improve and extend an existing community shop by providing a new building to replace the existing temporary structure. Additional facilities including a new cafe and meeting space will be provided. Officers have been unable to score this application higher as no evidence has been provided that any wider consultation has taken place and the decision appears to have been made at Director level.
|
Score |
3/6 5/6 |
|||||||||||||||||
Community benefit The project will provide a community facility which is open/accessible to all and will promote social cohesion and reduce loneliness in a rural area. It also provides additional services to those with disabilities and mobility issues and supports local people/families on low incomes. |
Score |
6/6 |
|||||||||||||||||
Action on Climate Emergency The South Stoke Community Shop has implemented regular minor activities that contribute to the Climate Emergency, such as promoting locally sourced food with low food miles and low carbon footprint, and does not provide single use plastic bags.
The applicant has provided additional information regarding how the shop will be built with energy efficiency in mind, but officers are unable to increase the score based on this information. |
Score |
3/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation have provided a funding plan which includes their own contribution of £5,000 and £20,000 being made by South Stoke Parish Council. A further £100,000 from other grant schemes has not yet been applied for and another application for £200,000 has been submitted to the UK Shared Prosperity Funding scheme which is yet to be secured. They have allowed a five per cent contingency on their project costings breakdown and a very small contingency within unsecurred grants (£7,207) to cover any funding shortfall.They have not budgeted for ongoing maintenance or replacements.
Officers have reviewed the additional information provided, but no further points can be awarded in this section as no further funding has yet been secured for the project. |
Score |
1/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Improved economic and community wellbeing'. The organisation have given relevant responses that address better outcomes to a good standard under the specific theme. Some examples have been provided regarding collaboration with other organisations and partnership working with the Village Amenities Charity and the parish council, however no further details have been provided in relation to key measurable outcomes.
The applicant has provided additional information in terms of collaborative working with the local community regarding project delivery and the wider development plan for the village, so officers recommend increasing the score to four points. |
Score |
3/6 4/6 |
|||||||||||||||||
Financial and project management plans A funding plan has been provided however it lacks detail on identifying external sources of funding for the project. Their application to the UK Shared Prosperity Funding scheme (South Oxfordshire District Council) for £200,000 is yet to be decided. The organisation and South Stoke Parish Council are contributing £25,000 themselves and a further £75,000 they are requesting from this panel, which would still leave a substantial funding gap. For year end 2023, the shop is running at a small loss and their capital/reserve balance is £10,000 however the organisation has been operating successfully for the past ten years. They also have a team of volunteers who run and help maintain the facility.
The applicant has advised their bank balance has increased to £13,000 and their current trading year is running healthily in profit, which with the provision of tea room facilities will further improve their existing strong financial performance. They reported having a record number of volunteers currently working in the shop.
Demand for services and other similar facilities The project will benefit approximately 500 residents in a rural location where the nearest shop is six miles away in a neighbouring town. The community shop has served the local community for the past ten years and supports the upgrade. However no evidence for demand of this project has been provided. The facility also offers volunteering opportunities to local residents. Internal Consultation
Climate: The South Stoke Community Shop is making some
progress in considering the Climate Emergency within their daily
operations. However, they could go much further in the
specification of the proposed building works. There are aspects of
the specification where greener alternatives could be considered,
for example when choosing vinyl floor and plastic skirting over
more sustainable options. They could use this opportunity to create
a net-zero building, and are missing information about the
specification of the heating system which could make a significant
contribution to the climate emergency if low carbon technology is
chosen. Are air conditioning units essential or is it possible to
design the building with natural ventilation? Does the lighting
have movement detection?
The applicant has provided additional information stating that the current village shop building is far from efficient and to combat this, the new building will be more energy efficient using the most affordable green materials, offering the best levels of insulation and using motion sensitive lighting. Additionally they will install solar panels and battery storage which, over the course of the year will be more than sufficient to power the needs of the shop with excess being sold back into the grid and should funding allow they would like to install ground source heating. Officers would strongly recommend that they pursue ground source heating at this stage as it will be far more expensive to 'retrofit' at a later date. The inclusion of air conditioning is a requirement for good food management rather than from a comfort perspective.
Additional information
has been provided to confirm that disabled access and inclusive
toilet facilities will be included in the
project.
Project completion within timeframe The project is expected to start in May and last for six months. Officers are concerned that should the grant applications not be successful in full, the project could face a significant funding gap that could impact on the start date. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS
No points have been deducted from this application.
Officers are concerned that the project still has a significant amount of funding to raise, and the funding plan is reliant on receiving large grants that are yet to be secured.
The applicant has provided a letter of consent for the works from the landowners, South Stoke Parish Council and South Stoke Village Hall and Recreation Ground Charity. This letter also states the intention to enter into a new lease with the applicant for a term of not less than 15 years to replace the existing lease currently in operation on a rolling month-to-month basis.
Due to the value of grant requested, the policy requires that the applicant must provide a copy of their lease with at least 10 years remaining. This is because we expect the asset to be available for community use for at least 10 years.
Suggested conditions:
· A 'charge' or 'restriction' is added to the Land Registry Title register. Evidence to be provided when this has been added to the Land Registry title register. · No funds will be released until a new lease is executed. · No funds will be released until evidence of securing full funding for the project is provided.
The applicant is also encouraged to consider sustainable options for the final specification of the project. |
Total score |
16/30 19/30
|
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? We will provide cafe services, electric car charging, a community space for people to meet whilst using the recreation ground. We also expect that community football will return to the recreation ground and we can support this via the shop. How do you know there is a need for your project? We already provide all the services but the building we use is due to be decommissioned, so it is new build project rather than an improvement to an existing facility. |
Community Benefit Questions from application form Who will benefit from your project? The whole community of South Stoke and surrounding villages will benefit from the new shop. It will provide local shopping, a meeting place as well as serve as a support function for local youth football. Every resident in the village will benefit from having excellent local facilities to use.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. Offering local shopping opportunities benefits those with limited access to travel and those who wish to focus more on green issues. Pricing does not exclude those on tight budgets as we cater for those too. We will have easy access for those with disabilities and we will continue to offer free delivery to those in most need in the village. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? We have an excellent green outlook. we stock and sell locally produced meat and fresh fruit and vegetables with limited or zero food miles. we will have solar panels fitted to the roof, offer ev charging and recycle / compost all that is available. Buying local is one of the best means of reducing ones carbon footprint. We do not offer new plastic bags, instead offer a "borrow" a bag scheme which ensures bags already in existence are re-used again and again. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? The shop is proven as self financing over the past 10 years. The board will be responsible for the upkeep of the building and will recycle the moderate generation of profits into an annual sinking fund. The shop itself is a not for profit organisation. We also have a team of volunteers who are currently committed to the upkeep of the existing shop and will continue to act in this manner.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. The shop has covered all of its obligations over the past 10 years through trading on a not for profit basis - please see accounts for me details. |
Project theme – outcomes questions from application form What difference will your project make in your community? The impact our project will have will be huge. The village has supported the shop for 10 years and is fully behind the upgrade plan. You cannot overstate the impact this will have on the village and those who use the ridgeway long distance path. It will be a huge step forward in securing South Stoke as a jewel in the crown of South Oxfordshire.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. We work closely with the Amenities Charity in the village and we are fully engaged in conversation with the PC who are strong advocates of the plan. As we approach completion of the build, much of the interior work will be done by local trades who will give their time pro bono in support of the project. |
Tetsworth Parish Council |
Ref |
SCAP23-24\43 |
Project Name: Play area surface replacement |
||
Project Description: The play area on Tetsworth Village Green was upgraded 6-7 years ago but the surface has remained play-bark since before that time. This requires replenishment 3-4 times a year with between 6-9 pallets of bark in total. The cost for this has increased significantly in recent years, in addition to providing a reducing level of safety in between top-ups. The project would see this surface removed and replaced with a hard-wearing all-weather surface providing greater safety as well as removing the reliance on a wood-based product. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Tetsworth |
||
Potential number of beneficiaries: 200 |
Project Finances
Due to the additional information provided by the applicant, this table has been updated following the first publication of the board paper.
Organisations latest bank balance: £67,674
Previous community grants:
· SActive22\150 Village Green Exercise for All £1,000 – grant ongoing. · CGS2R\100042 Emergency generator project £1,000 – grant offer declined. · CGS21-22/167 Tetsworth Play Area Skate Ramp Refurbishment £1,130 – grant complete. · CGS20-21/180 Tetsworth Parish Council Noticeboard £1,280 – grant complete. · CGS19-20/184 New parish noticeboard £1,675 – grant application unsuccessful. · CGS19-20/183 Community village shelter £3,000 – grant application unsuccessful. · SC17-18/99 Tetsworth Children’s Play Area Refurbishment – installation of adult gym equipment £8,250 - grant complete. · CGSHB\2 Tetsworth Children’s Play Area Refurbishment – resurfacing play area with bark and rubber crumb materials £3,900 - grant complete. · SCCG/166 Travellers site, fighting fund £3,000 – grant application unsuccessful.
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project significantly improves a community facility by making the playground surface safer and more accessible to all. The play area identifies as a key community asset to local residents, and following a Patch Annual Inspection in February 2023 reported that the surface did not meet health and safety requirements. There is no evidence provided that consultation has been carried out with existing users or the wider community. |
Score |
3/6 |
|||||||||||||||||
Community benefit The project will improve a facility that is open/available to the whole community, and as a result of this project will allow further works to be undertaken to improve overall accessibility to the playground. It aims to particularly benefit young families who live in the local and surrounding areas. |
Score |
5/6 |
|||||||||||||||||
Action on Climate Emergency The organisation has given some consideration into possible actions that address the Climate Emergency, recognising that the parish council is limited in its ownership of buildings and assets. The application evidences research into improving the energy efficiency of a building it does own, and has leased land at no charge to a charity where local children can learn about the environment and their place in it.
The applicant provided additional information regarding the sustainable play surface which officers support, but are unable to increase the points based on this information. |
Score |
2/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The parish council are contributing more than 50 per cent through CIL funding with a contingency of £9,500 towards the project if required and general maintenance/repairs. A further £10,600 has been applied for but not yet secured which if successful, along with their request to this scheme could more than cover the costs of the whole project.
|
Score |
4/6 6/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Improved economic and community wellbeing'. The applicant has addressed how this project will provide better outcomes to the local community and will be economically beneficial in terms of reducing maintenance costs for the area in general. However, it lacks detail on any collaboration or partnership working or how the success of the project will be measured.
The applicant has provided additional information to show minor partnership working in terms of project delivery, so officers have recommended increasing the score by one point. They have also given more detailed responses on the outcomes and how the success of the project will be measured. |
Score |
1/6 2/6 |
|||||||||||||||||
Financial and project management plans The bank balance of the parish council is £67,674 and they are contributing £26,391 from CIL funds, with a contingency plan for additional funds towards the project if needed and/or ongoing maintenance/repairs. The material used to resurface the play area will be hardwearing and more sustainable for the parish council's budget in the long-term, as previously had to replenish the surface with bark three/four times a year.
Please see finance table above for revised project finances provided by the applicant.
Demand for services and other similar facilities The applicant states that approximately 200 residents will benefit from the project. This is the only recreation ground and children's play area in the village. Internal Consultation Climate: Officers would encourage the applicant to include tree planting and other biodiversity enhancements as part of the wider project, making a positive contribution to nature and carbon capture. We support the use of suppliers who have a sustainability policy, use recycled/sustainable materials, recycle the old equipment it removes and use chemical free processes. There is no evidence within the application that this is a consideration in selecting a preferred supplier. The parish council is also encouraged to consider making a climate policy and action plan going forwards. The Harlequin quote does not suggest that the material used is recycled, however Ecosurface's website does talk about the sustainability of their products and commitment to integrating climate action into their business practices. It is good to see suppliers publicise their commitments and ISO certification for different environmental standards.
The organisation has
provided additional information about the preferred supplier
(Ecosurface) and their green credentials and further addresses the
climate emergency with the reduced use of wood-based products for
the play area surface. Project completion within timeframe The project is estimated to start in May and last for about three months, so officers are confident that the project would be completed within the 12 months timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
15/30 18/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? No How do you know there is a need for your project? The play area is identified as a principal community asset in the Tetsworth Neighbourhood Plan 2035. The need to refurbish the play area was identified in the Tetsworth Community Led Plan in 2015 and the equipment was replaced by 2018 but the surface was not. This project is designed to address that need. The funds that the parish council currently spends on renewal of the play-bark, £1,750 budgeted for 2323-24, could then be allocated elsewhere. |
Community Benefit Questions from application form Who will benefit from your project? The play area benefits the community as a whole
and is designed for children up to the age of 12. In the 2021
census, there were 105 children in the parish aged between 0-9, and
102 between 10-19.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. This project does not directly provide improved access to those with disabilities, but completion of this project will allow the council to undertake another one to replace the fence and gate currently surrounding the play area, to include wider gates which will improve such access. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? Tetsworth Parish Council has no offices, nor
does it own the village hall or village green; it's day-to-day
business is carried out either electronically or in person.
Apart from those documents required to be published physically, the
Council does not use paper for correspondence. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? The Council budgets for routine maintenance of the play area each year. An earmarked fund already exists for equipment replacement, which will be expanded to prepare for any surface renewal in the future.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. As of mid-October 2023, of the Council's annual precept of £29,226, £12,832 remains. All of this, except perhaps some of the £1,500 available for S137 grant allocation, will be spent on its 2023-24 budget. The council's CIL holdings are committed to this particular project and the remainder of its funds are earmarked either for other specific purposes or as a reserve for unexpected expenditure. |
Project theme – outcomes questions from application form What difference will your project make in your community? The project will enhance the safety of those
using the play area, both of itself and by providing contouring
around equipment of different heights . Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. Applicant did not provide a response. |
1st Goring Heath Scout Group |
Ref |
SCAP23-24\48 |
Project Name: Scout Hut Window Replacement and Access Ramp Project |
||
Project Description: 1st Goring Heath Scouts Group is very fortunate to be based in a purpose-built, extremely rare, traditional Scout hut dating from around 1930 with a beautiful site, ideal for Scouting activities. The hut is a local landmark and a heritage asset, much-valued by the community. It has its original metal windows and oak cladding, with cedar roof shingles. However, the windows are now unfortunately in a poor state of repair. The original wooden frames are rotting and could potentially fall out and put the fabric of the building at risk. If the windows deteriorate further, the frame of the building could be compromised requiring very substantial remedial work. The largest window is currently being repaired with funding from Councillor Community grant scheme 2022/23, and this project will allow for a craftsman to repair the rest of the 13 windows. The craftsman will replace the woodwork and refit the original metal frames, preserving the heritage value of the Hut for the community. Repairing the windows will ensure we will be able to continue to provide activities for a large number of young people far into the future as the hut will be fit for purpose. This project will also enable us to build a permanent wheelchair access ramp to the Scout hut. Our Scout and Guides groups are highly inclusive. However, the hut is currently accessed via some steps which means that not all persons can easily access the hut without requiring assistance. To ensure that our hut can be easily accessed by all users, the project will enable us to construct an exterior wheelchair-friendly disability access ramp. We have a disabled toilet in a toilet block separate to the main building and this project will be an important part in continuing the accessibility improvements to adapt the historic hut. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Goring Heath |
||
Potential number of beneficiaries: 500 |
Project Finances
Due to the additional information provided by the applicant, this table has been updated following the first publication of the board paper.
Organisations latest bank balance: £30,615
Previous community grants:
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation This project moderately improves and extends the life of a substantial community facility. The installation of a new ramp, although only approximately 18 per cent of the total project cost, will significantly increase accessibility for disabled and mobility impaired people. The main part of the project is replacing like-for-like woodwork around the windows and refitting the original metal frames in order to preserve the heritage value of the scout hut. The need for this work has been identified at committee level. Feedback has been formally invited via their AGM which is open to the local community. |
Score |
3/6 |
|||||||||||||||||
Community benefit The project will make improvements to a community facility that benefits two or more youth groups - Beavers, Cubs, Scouts, Brownies, Guides and Explorers, as well as visiting groups who hire the facilities during weekends throughout the year. The ramp will have a positive impact on individuals with disabilities enabling them to access the hut independently and participate in the activities more easily. |
Score |
3/6 |
|||||||||||||||||
Action on Climate Emergency The group regularly organises activities that address and raise awareness of the climate emergency. Some minor changes have been made to the building, such as installing energy efficiency lightbulbs, and the group has organised climate-focused activities for members, such as tree planting and sessions on recycling and nature conservation. |
Score |
3/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation has got a funding plan but they haven't applied for it all yet. They have secured £2,500 so far, including their own contribution but this is less than 50 per cent of the balance. They have budgeted for ongoing maintenance through the Scout Group's annual operating expenses.
The organisation has provided additional information to confirm that they are able to increase their contribution to £7,591, so they have secured all the other funding needed for the project. They continue to set funds aside in the reserves for required maintenance and replacements in the future, therefore officers recommend increasing the score to six points. |
Score |
2/6 6/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority
The project theme selected is
‘Improved economic and community
wellbeing’.
|
Score |
2/6 3/6 |
|||||||||||||||||
Financial and project management plans The budget breakdown looks reasonable and plans to bridge the funding gap/contingency seem achievable. Officers note that they are able to use reserves to cover the shortfall if they are unable to raise enough funds from additional sources identified in their fundraising plan. Due to the size of the grant request, they did not need to submit a project plan. Demand for services and other similar facilities The organisation has estimated that 500 local residents will benefit, primarily young people from across the parish. The applicant notes that the scout hut is hired out for visiting groups approximately 20 times per year, with approximately 20 people each time, potentially adding another 400 beneficiaries to the total. Internal Consultation Climate: The repair of the scout hut windows will bring some minor positive energy efficiency improvements. Officers would encourage the applicant to commission an energy audit for the building, which will provide more detailed information about the most effective energy efficiency measures to reduce carbon emissions and save on energy bills. The scout group are also encouraged to consider plans and policies for their own organisation in addition to those of the Scouts national body. For example, basic energy and water saving behaviours in their building such as turning off lights, active travel, climate impact of the food they consume etc.
Equalities:
It is good to see they want to build
a ramp so the building is fully accessible. It is recommended that
a ramp width should be 1.2m wide, rather than 1.1m wide. Project completion within timeframe The estimated start date is May 2023 for approximately six months. It seems realistic that this project would be completed within the 12 month timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
13/30 18/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? The project will improve both existing features of the hut as well as add something new to it. The hut’s original windows will be repaired, and window frames replaced, and the project will add a new feature to the hut through the construction of a permanent disability access ramp. How do you know there is a need for your project? The project has been identified by the Scout executive committee members (Trustees and Scout and Guide group leaders) who are all volunteers from the community that is served by the Scout and Guide groups. Many are also parents of current and previous Scout and Guide group participants and are closely tuned in with the needs of the group and the requirements for maintenance and upgrading of the facilities. As described above, the need to replace the window frames is clear due to the current state of the windows and the need to construct a disability access ramp reflects the commitment to improving access for people with disabilities. Both initiatives have been discussed at various executive committee meetings as well as at the annual general meeting which is open to all the parents, families and the local community providing an opportunity for feedback and consultation. Repairing the windows has been identified as a high priority followed by the access ramp, withing funding constraints. |
Community Benefit Questions from application form Who will benefit from your project? The project will especially benefit young
people: we provide structured youth development programmes for
young people from across the parish and we currently have a Beaver
Colony, a Cub Pack, a Scout Troop for boys and girls (70 young
people) and a Brownie Group and a Guide Group (30 young people),
and Explorers (20 people). Additionally visiting Scout Groups,
Guide Groups, Schools, and Youth Groups also book and use the
facilities during weekends throughout the year. The hut is hired
out for visiting groups approximately 20 times per year, with
approximately 20 people benefitting at the time, adding another 400
beneficiaries to the total number of people who will benefit from
the project. The project will therefore have a positive impact on a
significant number of young people.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. Goring Heath Scout group is inclusive and provides activities for young people irrespective of means, religion, gender or disability. We reach young people from various socio-economic backgrounds; young people with special educational needs such as autism and ADHD; and we have also welcomed Ukrainian refugees into our sections. The access ramp will specifically bring benefits for individuals with disabilities, especially wheelchair users and people with mobility challenges ensuring our hut can be accessed by all users with or without assistance. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? The 1st Goring Heath Scouts and Guides group
regularly takes action to improve environmental sustainability and
adapting to climate change.
|
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? Regular on-going maintenance related costs will be minimal and will be covered by the Scout Groups annual operating expenses. The window frames will be replaced with durable new frames, easy to paint and easy to keep in good condition. The same with the access ramp, it will be low maintenance and cost will be covered from the operating budget. The Scout Group will continue to set aside funds, as currently, for reserves which can be used for larger one-off maintenance costs which are not covered by the usual operating funds.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. The Scout Group has fixed operating costs including HQ annual census c£3,500, insurance £1535, maintenance (including repairing and treating the shingle roof c£2500) as well as the other regular running costs such as grass-cutting £700, cleaning £1400 and waste collection c£1000. We have reserves to ensure we are able to carry out any emergency repairs to the hut and ground and that we can continue operations should we, for example, be unable to hire our facilities out restricting out ability to raise funds for operational costs. We used to have free use of an acre of land to the front of the Hut for many decades, but this has since been stopped. We wish to purchase the land in the future and need to therefore retain some of our reserves for that purpose. However, we are prepared to use reserves to cover the shortfall in this project should we not be able to raise enough funds from additional sources as identified in our fundraising plan. This ensures the project will be able to go ahead if our application to the Capital Grant Scheme is successful. |
Project theme – outcomes questions from application form What difference will your project make in your community? The impact of the project on community wellbeing will be very clear: having in place an improved, safe, secure, fit for purpose, and more accessible facility for young people, volunteers and visitors to use, to carry out activities that create positive impacts in the community and in the lives of the young people. Success will be easy to assess – the replaced window frames will protect the integrity of the historic building and the access ramp will ensure that more people will be able to enjoy activities in the hut without facing limitations and barriers. The hut will continue to be a valued community asset, used by thriving groups of young people taking part in activities that leave a positive imprint in the community around them.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. Community engagement and playing our part at the heart of the community has always been at the core of Scouts and Guides. Our sections are very active in the local community and regularly partner with other organisations and take part in local events to support them. Our sections, for example, participate in many annual community events such as memorial day services at Goring Heath and Woodcote memorials; Woodcote 10k run handing out water for participants; helping out at the Woodcote Steam really as well as the Woodcote village fete; we support the local Lion’s Club annual Santa activities in the village; and at Christmas time our young people in Beavers deliver hampers to older residents of the village. The hut also hosts important community events such as the Platinum Jubilee party. The community around us is very supportive of the Scouts and Guides and the relationship is reciprocal. The project will enable the Scouts and Guides to continue to partner with many different stakeholders in the community. We will also be able to continue to host important community events as the facilities will be fit for purpose. |
Didcot District Guide Association |
Ref |
SCAP23-24\68 |
Project Name: Refurbishment of our hall |
||
Project Description: To make good the roof which has no insulation, to replace window frames which have holes in, to put insulation in the wall cavities, to replace all water pipes with lagging and to replace flooring with more appropriate covering. The works will make the hall more secure from the outside elements which in turn will require less heating to be used. The new flooring will allow the Guides to do more activities without trip and slip hazards. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Didcot |
||
Potential number of beneficiaries: 150 |
Project Finances
Due to the additional information provided by the applicant, this table has been updated following the first publication of the board paper.
Organisations latest bank balance: £40,392
Previous community grants: None
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project will significantly improve a community facility for existing users and increase numbers in general. Officers have been unable to score this higher as no evidence has been provided that any consultation has been carried out and the decision has been taken at a committee level. An Accessibility Audit has not been provided. The hall is not in use presently due to a burst water pipe and further work was identified when the suspended ceiling was removed, to include energy saving measures and replacement flooring. |
Score |
3/6 |
|||||||||||||||||
Community benefit The project will primarily impact on the wellbeing of more than one priority group, as the facility is used by Girl Guides and related groups for all ages. It will enable the groups such as Sustainable Didcot and the Womens Institute to enjoy a more enhanced programme of activities, with the aim of encouraging other support groups in the local area to use the facility when the hall improvements are completed and it has re-opened. |
Score |
4/6 |
|||||||||||||||||
Action on Climate Emergency The Guide Association has completed some activities such as tree planting. Evidence provided is mostly of national rather than local girl guiding schemes. The proposed project is an excellent example of tackling the climate emergency. This is a future project so not reflected in the score.
Additional information regarding the provision of regular learning activities has been provided, therefore officers recommend increasing the score to three points. The applicant is encouraged to look at opportunities to translate the learning into practical actions. |
Score |
2/6 3/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation have provided a funding plan, contributing £22,000 themselves with £27,500 grants already applied for (officers have reduced this by £15,000 as the applicant was unsuccessful with their application to the South Councillor 2023/24 grant scheme. We are also unclear if the £27,500 includes the request of £24,999 from this scheme). They have identified another £10,000 grant they intend to apply for when it opens which will provide a contingency in the event of a funding shortfall, if they are successful. They currently have secured less than 50 per cent of the project costs through their own contributions. Additional funds have been allocated towards the ongoing running/maintenance costs and for the temporary hire of a hall they are currently using, until the works are completed and they can return to the Guide hall.
The applicant provided additional information confirming they have secured an additional £840; however officers are unable to increase the score for this section due to the amount of funding still unsecured for the project. |
Score |
2/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is ‘Improved economic and community wellbeing’. The applicant has addressed how the improved facility will attract other clubs and support groups to use the hall and this will be measured by the increase in numbers benefitting from the facility. There is no detail given on any collaboration with other organisations or partnership working within the community. Some consideration has been given to better outcomes for the local community. |
Score |
2/6 |
|||||||||||||||||
Financial and project management plans The organisation’s bank balance is £40,392 of which they are contributing £22,000 of their own funds to the project with remaining balance set aside for running and maintenance costs of the hall. They have a funding plan but have not yet applied for all the funds yet.
Additional information has been submitted advising that one grant application for £15,000 was unsuccessful, however they have identified other grant schemes to which they have applied for £11,000. They are continuing to look for other sources of funding and organise fundraising activities to support this project and future projects.
Demand for services and other similar facilities The applicant states that approximately 150 people will directly benefit from this project with potential to increase numbers when the works to the hall are undertaken and the facility is in use again. Internal Consultation
Climate: Didcot District Guide Association are encouraged
to consider plans and policies for their own organisation in
addition to those of the Girlguiding national body. For example,
basic energy and water saving behaviours in their building such as
turning off lights, mode of travel to meetings and events, climate
impact of the food they consume etc. The project quotations lack
some detail, for example we would like to see that consideration
has been given to climate friendly choices, for example, are there
reclaimed or recycled options for the flooring, and could the
lighting installation include motion sensors as best
practice. Additional information has been provided by the applicant in terms of further energy efficiency measures being taken for the project, including roof/cavity wall insulation, efficient radiators/lagged water pipes, motion sensor lights and will also look at sourcing sustainable/reclaimed materials for the flooring, with future project planning to include installing solar panels. Within their Guide programme they have also delivered on subjects such as single use plastic, water conservation, wind/solar power, bike maintenance, food waste and recycling at their weekly meetings for girls aged between 4 and 18 years old.
Project completion within timeframe The project is expected to take approximately four months so officers are confident that the project will complete within the 12 months timeline. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
13/30 14/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? At the moment we are unable to run the full Guiding programme due to our equipment being stored away from the meeting place we have had to hire. Being back in our hall will mean that we have a safe environment with all the equipment in one place for the Guides to enjoy. We will be able to offer (to name a few): Games Sensory activities Craft Cooking Sleepovers Robotics Computing How do you know there is a need for your project? The issue with the roof was identified when we
had a burst pipe and removed the suspended ceiling, whilst we had a
builder we asked him to identify how we could improve the overall
warmth of the hall. |
Community Benefit Questions from application form Who will benefit from your project? We have 150 Girls aged between 4 and 18 plus
Adult Leader already registered and taking up places in Rainbows,
Brownies, Guides, Rangers
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. We welcome any
girl into our Guiding units from any background. We have Trefoil
Guild which is Guiding for adults from any background.
|
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? Girl Guiding UK promote environmental sustainability, we have gone paperless and most meeting are held electronic, we have taken part in the Queens canopy initiative by planting trees in all our Guide owned sites. We have a plastic promise and most term cover an environmental programme to get the Guides involved. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? We fund raise annually for the upkeep of the
hall, and any surplus is kept for any emerging issues.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. We have
£40,000 in our account we have earmarked £22,000 to go
towards the refurbishment, the remaining £18,000 will go
towards the running costs of the hall and rent to hire a hall for
our units to meet in until we are back in our hall. |
Project theme – outcomes questions from application form What difference will your project make in your community? We want to encourage more to use our facilities by offering a warm welcoming hall whether that is increasing our Guide numbers or advertising for local groups with vulnerable people to use our facilities. The success will be in the increased numbers that we have using the hall.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. We have Guiders and Guides families and friends helping us to fund raise, the hope is get the funds to do the main work then if we have a surplus of funds to start on refurbishing the kitchen so as to offer hot meal and cooking skills to those who need it. |
St Leonard's Parochial Church Council |
Ref |
SCAP23-24\44 |
Project Name: St Leonard's church bells restoration |
||
Project
Description: Whites of
Appleton, bellhangers, were asked in 2022 to inspect the church
bells, which range in date from 1587 to 1905, and recommend any
actions required. In brief, they noted that, although
maintained for safe ringing, it did not appear that any major work
had been carried out on the tower since 1905 when the current frame
was installed and two bells added to the existing ring of
six. They recommended that significant restoration work be
carried out to ensure that the bells will be fit for ringing for
the foreseeable future. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Watlington |
||
Potential number of beneficiaries: 2,000 |
Project Finances
Organisations latest bank balance: £37,281
Previous community grants: None
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The project moderately improves a minor community activity. It replaces like-for-like equipment as it will restore the original bell infrastructure. It is anticipated that the works will improve access to bellringing as the bells are heavy and are becoming increasingly difficult to ring as their infrastructure deteriorates. The restoration work has been recommended as a result of an inspection and there is no evidence that consultation has taken place with the community. |
Score |
1/6 |
|||||||||||||||||
Community benefit The primary beneficiaries of this project are the bell ringers who are a single special interest group. Access to bell ringing at St Leonard's is limited only by the safety requirements of the belfry located in an ancient building. Officers note that they encourage new ringers to join them at every opportunity. They have estimated that 2,000 local residents will benefit but the indication is that this is indirectly via the sounds produced by the bells. |
Score |
1/6 |
|||||||||||||||||
Action on Climate Emergency St Leonard’s is working with the Diocese of Oxford to support the church's transition to net zero. It has has implemented multiple activities such as an energy audit and replacing lights with LEDs. It has commissioned a company to look at the feasibility of introducing an Air Source Heat Pump. Officers are unable to access their net zero action plan to justify a score of four points.
|
Score |
3/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation have a good funding plan and they have already secured more than 50 per cent of the balance. They have included contingency funding should some of their applications be unsuccessful or partially successful. They have stated that maintenance is minimal and it will be funded by the bell ringers or church from available funds. |
Score |
4/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority
The project theme selected is
‘Improved economic and community
wellbeing’. |
Score |
0/6 |
|||||||||||||||||
Financial and project management plans The organisation has already secured a significant amount of funds towards this large project, highlighting community support via local charities, businesses and individuals. Their funding plan demonstrates how they aim to cover the outstanding amount. The funding raised is ringfenced from other assets and liabilities in restricted funds. Due to the size of the grant request, they did not need to submit a project plan. Demand for services and other similar facilities The applicant states that restoration of the bells is a project which would be expected to recur once a century. The project aims to secure the viability of bellringing at St Leonard's for the foreseeable future and enable more people to participate in bellringing. Five new ringers have been taught within the past year. Internal Consultation
Climate: The church is using a local supplier which will
help to minimise carbon emissions from transport. The works
themselves will focus on the restoration of the bells, and the
emissions created from cast iron fittings etc will be partly offset
by the long-term nature of this preservation work. It is positive
to see that the applicant is also looking at improving the energy
efficiency of its building which will further reduce the church's
climate impact. Equalities: The equalities officer understands the need for this request as the Church and its members will benefit from restoring the bells, however they note they can’t see any benefits for improving facilities by making it more accessible for all.
Project completion within timeframe The estimated project start date is May 2023 for approximately three months. Officers note that £20,847 funding still needs to be identified and applied for (however this does allow for £11,607 contingency should they not receive the full award requested). This could impact on the ability to complete within the 12 month timeframe.
|
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
9/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? No How do you know there is a need for your project? The bells in the tower are relatively heavy,
ranging between 6cwt and 24cwt, and as the fittings deteriorate
with use are becoming increasingly difficult to ring, even by
able-bodied ringers. Consequently the restoration work is
required to ensure that the bells will continue to be ringable for
the foreseeable future. |
Community Benefit Questions from application form Who will benefit from your project? Access to bell ringing at St Leonard's is
limited only by the inherent limitations imposed by a belfry
located in an ancient building, especially regarding safety.
We encourage new ringers to join us at every opportunity, with five
new ringers having been taught to ring within the past year.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. Access to the
belfry is necessarily restricted on safety grounds. However
access is free on request and is encouraged for anyone who is
interested and is able to negotiate the ancient building
safely. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? St Leonard's is a church within the Diocese of
Oxford. The Diocese has set out its policy as follows
(https://www.oxford.anglican.org/environment-and-social-justice/environmental-action/). |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? Restoration of the bells is a project which would normally recur once a century perhaps. Maintenance costs in the interim are minimal and are funded by the bell ringers or church from available funds.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. There are no financial commitments which affect how much the PCC can contribute to this project. All of the funding raised and to be raised is ringfenced from other assets and liabilities in restricted funds. |
Project theme – outcomes questions from application form What difference will your project make in your community? The church bells are a very significant part of
the heritage of the local community. Without
significant restoration work, they will continue to deteriorate
with use, or lack of use, and will eventually become
unringable. At that point it is probable that the resources
required to bring them back into use would not be available and
they would be lost permanently.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. Local charities, businesses and individuals have responded very positively to invitations to support the project and it is through their support that it will be delivered. |
SHEDQUARTERS |
Ref |
SCAP23-24\41 |
Project Name: SHEDquarters workshop (outside garden and seating area) |
||
Project
Description: SHEDquarters
aim is to alleviate feelings of loneliness and depression in our
community. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Rotherfield Peppard |
||
Potential number of beneficiaries: 50 |
Project Finances
Organisations latest bank balance: £30,842
Previous community grants:
· SCAP22-23\100009 Premises for "Shedquarters" workshop £22,500 - grant application unsuccessful due to lack of planning permission, landlord consent and lease. · CGS23-24/172 Equipment for the Shed £2,000 – grant offered, pending acceptance. Grant offer now accepted.
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation The application mainly focuses on the project to create a shed (workshop) but this project is actually for creating an outside garden and seating area around the workshop. The project is due to moderately improve a minor facility by creating the outdoor space, however the facility (workshop) has yet to be built, so until this is built little additional use will take place. Although they have provided two letters of support for the Shedquarters project, officers have been unable to determine if it is for the workshop and/or outside space so unable to justify a higher score.
The applicant has provided additional information clarifying the need for an outside area, so officers recommend increasing the score to three points. |
Score |
1/6 3/6 |
|||||||||||||||||
Community benefit This project appears to be in the initial planning stages so there is limited community benefit. The project will primarily benefit a special interest group for members only. The organisation stated the project will benefit approximately 50 residents (in and around Sonning Common) which is the lowest number of beneficiaries compared to other projects, although officers note the beneficiaries are a priority group.
The applicant has provided additional information regarding plans for the workshop, and how the outside space will be used as a therapy area that will promote social cohesion for vulnerable and isolated residents, therefore officers recommend increasing the score to four points. |
Score |
1/6 4/6 |
|||||||||||||||||
Action on Climate Emergency The organisation is very new and therefore at the start of their climate journey so should be encouraged. The application has given some consideration into possible actions that address the Climate Emergency, such as through repair workshops and using recycled materials, however due to the early stages of this project and newly formed organisation, they are unable to provide evidence of any actions undertaken.
Due to additional information provided officers recommend increasing the score to two points, to recognise that although they are a new organisation, they will be fulfilling an important role in delivering a repair service for the community. |
Score |
1/6 2/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation has secured all the other funding needed for the project as they are funding over 50 per cent of the project themselves. They have stated that ongoing costs and maintenance will be covered by membership donations. They do not have a contingency plan in place should they receive a partial grant. |
Score |
4/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority The project theme selected is 'Improved economic and community wellbeing'. The applicant has provided a relevant response that addresses how a capital grant will provide better outcomes to the community at an acceptable standard. It will have a positive impact on combatting loneliness and depression, but more detail is required on how these outcomes will be measured. They have provided some information regarding collaborative working with organisations and the community, but as the application mainly focuses on the workshop benefits, officers have scored this two points.
The applicant has provided additional information focusing on how the outside area will provide better outcomes to the community at a good standard, so officers recommend increasing the score to three points. |
Score |
2/6 3/6 |
|||||||||||||||||
Financial and project management plans The organisation is contributing £5,000 of their own funds towards this project. They have a bank balance of £30,842 which is also ringfenced for the project to create the shed and stated they have no further fundraising plans as they have the funds required to proceed with the project i.e. match funding. Due to the value of the grant requested, the applicant was not required to submit a project plan. Demand for services and other similar facilities The organisation estimated that 50 residents will benefit from this project. They state that there are approximately 500 SHED projects in the UK (members of the UK SHED Association) and there is no such amenity in the locality (Sonning Common), however officers are aware of the Benson Community Shed and Thame Shed projects in the district. The emphasis of the application was based on the demand for the shed and not for creating an outside space for members and friends. Internal Consultation
Climate: Repair workshops such those promoted by
'Shedquarters' are important to drive the circular economy within
communities as a way to reduce unnecessary consumption through
repairing, reusing and reducing waste. The project itself however
is seeking funds for an outdoor patio, and the workshop has yet to
be built. We support the idea of community growing as an additional
activity for when Shedquarters has been established. Project completion within timeframe The project is expected to complete within five months starting in June 2024, however officers are concerned that until the shed (workshop) is built this project cannot take place, which could impact the start date. The applicant has provided additional information stating that the building chosen for the shed is currently going through building control, and they anticipate the building will be on the land in April 2024. Officers are satisfied that the project will be completed within the timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application.
Suggested condition if the panel are minded to fund the project:
· Evidence to be provided that the shed has been built prior to any grant funding being released. Officers feel this condition is no longer required, as an acceptable timeframe has now been provided. |
Total score |
9/30 16/30 |
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? Shedquarters will be providing a SHED (workshop) which will be situated in the grounds of the Peppard War Memorial Hall. A lease agreement has been entered into based on a period of 25 years between the Trustees of both organisations. The charity will be members of the SHED Association and there are approximately 500 SHEDS in the UK. Currently there are no SHEDS in our locality in South Oxfordshire, so we will be providing a much needed service to the larger community covering Sonning Common, Peppard and the many small villages in the South of Oxfordshire.
How do you know there is a need for your project? Not long before we went into lockdown with Covid
it was observed at a village tea party that there around 60 ladies
present and only 3 men. |
Community Benefit Questions from application form Who will benefit from your project? The SHEDquarters project will be open for anyone
in our community who feels lonely, isolated, depressed and in need
of friendship whilst being able to enjoy making use of their
skills.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. The prime
reason for setting up the SHED project was as described to address
the concerns over loneliness and depression in our community at
large. Much of this being a hangover from the lockdown in
2020. |
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? During the planning stage of the SHED project we
spent much time scouring our locality in order to find premises
suitable. We needed a site that ideally could be walked to and in
so doing would encourage the membership to excercise if
possible. |
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? The SHED project has received a large positive
response form both companies and private people in the general
community and to date has raised just over £51,000 which
covered the cost of applying for planning permission of the
building, and will cover the purchase of the building and the
connection of main services, ie electricity,water and foul drainage
also our contribution to this external works project.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. The
SHEDquarters project is totally run by volunteers and we have no
existing financial commitments that will effect our
contribution to the project. |
Project theme – outcomes questions from application form What difference will your project make in your community? SHEDquaters has already raised the required
funds to build the SHED and this project now
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. The delivery of this particular part of the
overall project will be done by volunteers who will project manage
and construct it using their own skills. |
Henley Town Football Club |
Ref |
SCAP23-24\58 |
Project Name: Facility for improvements, upgrade and maintenance. Mower and machinary and equipment storage |
||
Project Description: We are hoping to receive funding for a storage facility (to replace a very old outbuilding that has now become unsafe) this is for storage of machinery and sports equipment. A like for like workshop outbuilding (A&J Buildings) is approximately £10,000 for the workshop, with the requirement to build a new base for the structure and with the help of volunteers to achieve this. We have a contingency fund to help with the purchases of these items of approximately £2,000. We have also looked into the possibility of shipping containers which pose issues on delivery to the site due to weight restrictions on a bridge to the ground. Please see quotes for more detailed breakdown of either self-build or ready to assemble workshop, this would be replacing a like for like timber structure or the removal of the old shipping container to replace on the existing blueprint. The maintenance of the project would be monthly checks and annual wood stain treatment and roof checks. |
||
Application Theme: Improved economic and community wellbeing |
||
Location of Project: Henley On Thames |
||
Potential number of beneficiaries: 150 |
Project Finances
Organisations latest bank balance: £17,000
Previous community grants:
· SCap16\67 Upgrade of facilities £18,758 – grant complete. · SActive22\128 Equipment for club including goal posts, corner flags, line markers, paint etc £1,000 – grant ongoing.
Scoring |
|||||||||||||||||||
Community need, inclusion and consultation This project moderately improves a minor community storage facility by enabling the club's equipment to remain safe and secure. Little additional use or activities will be gained as a result of the project. There is no evidence of consultation and the decision to undertake the project has likely to be taken at committee level.
|
Score |
1/6 |
|||||||||||||||||
Community benefit A single sport group will primarily benefit. Officers note there is a clear intention to open up the club to wider community use however this does not relate to the replacement storage facilities the applicant is requesting funding for. Examples have been provided that include no entry charge for care home residents to watch football and a newly formed football team to improve men's mental health. There is a low number of beneficiaries compared to other projects in the same category.
|
Score |
1/6 |
|||||||||||||||||
Action on Climate Emergency Henley Town Football Club has given some consideration into possible actions that address the Climate Emergency, such as replacing lights with LEDs. They are also hoping to retrofit their building to improve energy efficiency as part of a future project. |
Score |
2/6 |
|||||||||||||||||
Financial sustainability Please see project finance table above. The organisation has a basic funding plan. The club will contribute £2,000 towards the project but they haven't provided evidence that any other funding has been secured. Ongoing maintenance will be carried out by volunteers. |
Score |
2/6 |
|||||||||||||||||
Themed criteria for chosen corporate plan priority
The project theme selected is
‘Improved economic and community
wellbeing’. |
Score |
1/6 |
|||||||||||||||||
Financial and project management plans There is a lack of information in the organisation's budget breakdown and so, officers are unable to ascertain how they are able to bridge the gap in funding for this project. Due to the size of the grant request, no project plan is required. Officers note that they have a network of pro-active volunteers and a committee with good connections to local business to manage the project. Demand for services and other similar facilities Henley Town Football Club is a long running grassroots football club with three teams. The applicant states approximately 150 residents will directly benefit from this project, however, officers feel that a storage facility is primarily for the benefit of club members. Internal Consultation Climate: Officers would encourage the applicant to source sustainable materials used for the storage facility from local suppliers, including FSC certified wood or from responsibly managed woodland, and using repurposed materials where possible. The football club is encouraged to consider agreeing a climate policy and detailed action plan going forwards to support their plans to improve the energy efficiency of their building.
Equalities:
No objections from equalities, the
project is not related to equalities or accessibility. Project completion within timeframe The estimated project start is May/June 2024 ready for the start of next season. Officers note that £3,000 match funding still needs to be identified and this could impact the start date and possibly the ability to complete within the 12 month timeframe. |
|||||||||||||||||||
DEDUCTIONS, CONCERNS AND OTHER CONSIDERATIONS No points have been deducted from this application. |
Total score |
7/30 |
|||||||||||||||||
|
|
|
|||||||||||||||||
Applicant responses |
Community Need, Inclusion and Consultation Questions from application form Will your project be providing new facilities or activities? Yes What extra facilities, equipment or activities will this project provide? With the request of the help to maintain and service our pitch and with more storage, we'd hope to open our doors to more members of the local community. Including a newly formed community football team, this is made up of people with physical disabilities and mental health issues on-going and recovering. We are currently talking with the local council and park services to help us with this as there is a major shortage of full size playing areas for adults to play football at a friendly and competitive level. Especially with the pitch and ground taking on more foot traffic. We have also recently tried to find out if we can open our facilities to more of the general public to support this end of Henley where there is limited areas to use loos.
How do you know there is a need for your project? Our project is not only ongoing, but to hopefully build and to support football in the local area, with a project to invite more people and continue the inclusivity of utilising a space for young adults to keep developing in this sport, perhaps not just football, but also using the clubhouse space for different event, we recently had a trial using the clubhouse on a Sunday morning for adults who wanted to play and learn the guitar, feel there is much more scope to offer other groups the option to use the space for a meeting place, such as a youth centre (which Henley no longer has due to house development) I feel a local football club can be more than just offering football based criteria, recently we hosted an under 13's girls county cup game and invited the local care home residents to come and enjoy a really fun filled match. Primarily, without the help of the correct machinery or a space to store this, moving forward to look after and maintain the grassed areas it would become more difficult to maintain a safe and playable surface for the teams that currently use the pitches. The need for secure and storage is inevitable to keep our equipment safe and secure. We would like further support in making sure more adult teams of men and women from all backgrounds have the chance to enjoy and play football. We are also looking at utilising the space with more focus on getting back into fitness with a campaign called move it to lose it. This will be based around people that are coming back from poor health, pre-diabetic and those that prefer to exercise outside in a group environment which will hopefully be affordable for all those involved.
|
Community Benefit Questions from application form Who will benefit from your project? The more we can maintain the premises and surrounding areas including the grassed pitch the more we can open up the facility to benefit young adults. We would like to look at making more use of the open space especially during the closed season where the areas could allow other people to use the space that might like to consider football as a way of keeping fit, but not necessarily as a competitive sport, but making it fun and different to keep fit. This should be accessible to everyone and we have recently opened our doors to three age brackets of a local girls’ team to play there matches in a football environment. There’s no reason with more ideas and support we cannot grow the club so that it can be used by all ages and different clubs and classes.
Have you considered how your project will improve access for the following groups of people: This is not an exhaustive or definitive list – the elderly, isolated young families, migrants, homeless, economically or educationally disadvantaged, individuals with disabilities, and those with impairments. Please provide further detail. We have more recently opened our facilities for a local care home to come and watch grassroots football. We welcome everyone at the club to come and experience the game without charge of entry so anyone can come along, we keep our hot drinks and refreshments at a very nominal fee for everyone to afford. We currently open up our doors to people with disabilities based on if they want to play football in a mainstream environment or a community level of football they should be able to, this includes physical and mental health. We want to encourage more people to get into football and training to help them integrate in a group sport and offer lots of encouragement to do so. The issue in Henley is open spaces with areas that are floodlit and available to hire most if not all are booked solid or out of some organisations price range. At HTFC we always try to accommodate something for everyone. We are currently looking at the use of space in our clubhouse and have recently trialled a music session for mental health, with good response and success. We feel there's far mire we could offer if there was more support and funding to our small club.
|
Action on Climate Emergency questions from application form Following the council’s Climate Emergency Declaration, it has an ambitious target to work towards creating a carbon neutral district. Has your organisation taken any steps to improve its own environmental sustainability? Unfortunately, with the massive focus on refurbishment of an old building, this has been very difficult. Although we have over the last couple of years started to replace most light units with LED. A suggestion of completely new windows and solar panels is an on-going topic. As it would be with a complete overhaul of our heating system and loft insulating. I will be as my next project and drive of improving this important topic be contacting your climate team for advice and direction.
|
Financial sustainability questions from application form What are the ongoing financial requirements for this project once the delivery is complete? We have a contingency fund of approximately
£2,000 to help with the base for the workshop space. The very
old wooden outbuilding and shipping container, which appears both
have been on site for over 30+ years these have now almost become
unsecure, derelict and dangerous to enter especially the wooden
workshop building which we are hopeful to replace like for like on
the blueprint.
Please give us detail of any existing financial commitments that affect how much you can contribute to this project, such as salary commitments or other known costs that you will incur. Currently we have a good support network of pro-active volunteers (we have no salary commitments) and also a very strong committee with good connections to local business that have always helped with refurbishment, maintenance and the running of our grassroots community football club over the years. We are fortunate enough to get a community support grant annually from a major business in Henley which has always been a very generous donation of £2,000. Last year we successfully applied for a community grant of £1,000 that help with our small 5 aside pitch and project. We have a nominal subscription fee for a member of £170 per season which also helps support the members/players that are financially able to self-fund and helps support the club with new kit and equipment. Our biggest financial commitment is our energy bill, rent and insurance which are budgeted for very stringently. We are lucky enough to have a small member clubhouse facility that is well attended on match days, training and rented out for functions of up to approximately 12 per year. Including fun days, charity organisations including schools, colleges and other local sports club. We would like to have more support to help with ongoing costs of refurbishment and maintenance and with the help of possible further grants towards items requested for the grant, this would enable us to fund other on-going costs related to the buildings and changing facilities, whilst retaining a safety net amount of funds in case of emergencies or major breakdowns, as our facilities are now over 30 years old and gradually lots of stuff within the building requires replacement.
|
Project theme – outcomes questions from application form What difference will your project make in your community? Fitness, health and wellbeing including working.
Tell us about any collaborations with other organisations/partners in the community to help support the delivery of this project. We have currently been working with colleges to improve our options to continue training and looking at partnership to share facilities, including the use of our facilities for a younger girls’ team that are looking to progress in football by using full size pitches in a safe environment. This would hopefully grow and not just be football focused when the season for football ends, with the space available we are hoping to grow the club and offer the facilities to the wider community to come and see what Henley Town Football Club is about being one of the oldest formed clubs since 1871 in the South of England and the oldest in Oxfordshire playing a major part in forming the football league is quite something in our opinion and keeping going over the years with struggles on and off the field, the club is quite resilient.
|